Name | Type | Posted | Actions |
|---|---|---|---|
FA568226Q0005 Q_A 11Jun2026.pdf | Jun 11, 2026 | ||
Solicitation Amendment FA568226Q00050001 SF 30.pdf | Jun 8, 2026 | ||
Solicitation Amendment - FA568226Q00050001.pdf | Jun 8, 2026 | ||
ASHE221058_Attachment 03_Pilot project steel support structure.pdf | May 19, 2026 | ||
ASHE221058_Attachment 02_Pilot project shop drawings.pdf | May 19, 2026 | ||
ASHE221058 REPAIR DOORS 1ST GEN PASs ZULU LOOP_CCEB.xlsx | XLSX | May 19, 2026 | |
ASHE221058 REPAIR DOORS 1ST GEN PASs ZULU LOOP_Technical specifications.pdf | May 19, 2026 | ||
Solicitation - FA568226Q0005.pdf | May 19, 2026 | ||
ASHE221058_Attachment 01_Pilot project lesson learned.pdf | May 19, 2026 | ||
Antimafia Self Declaration Form_Revision1.docx | DOCX | May 19, 2026 | |
ASHE221058_Attachment 04_Pilot project photo report.pdf | May 19, 2026 |
ASHE 22-1058 REPAIR DOORS AT ZULU LOOP 1ST GEN PASs, AVIANO AB, ITALY
Contact and place of performance
Sara Giacomello
Aviano, IT-36 33081
ITA
*****NOTICE TO OFFERORS: the due date to submit questions against this solicitation is 18 June 2026 at 2.00 PM local time. Submit questions to BOTH primary and secondary Point of Contact email addresses: [email protected] [email protected] *****NOTICE TO OFFERORS: Question and Answer document dated 11 June 2026 is hereby posted *****AMENDMENT 0001 is hereby posted. The purpose of th...
View moreALL QUANTITIES INDICATED IN THE PROJECT DOCUMENTS FURNISHED BY THE GOVERNMENT, INCLUDING THE CONSTRUCTION COST BREAKDOWN, ARE ESTIMATES AND THE GOVERNMENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE PERFORMANCE SHALL REQUIRE A COMPLETED PROJECT ON A LUMP SUM BASIS, IT IS THE RESPONSIBILITY OF THE OFFEROR TO CALCULATE, FORESEE AND PERFORM ALL QUANTITIES OF WORK MANIFESTLY NECESSARY TO DELIVER A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
SITE VISIT:
AN ORGANIZED SITE VISIT IS SCHEDULED AT THE DATE AND MEETING POINT SPECIFIED IN THE SOLICITATION, NORMALLY PARTICIPANTS WILL MEET IN THE PARKING AREA OF LVIS GATE (CONTRACTOR GATE) AREA F FLIGHTLINE, AVIANO AIR BASE.
ADDRESS: VIA LOCALITA’ TORNIELLI 18, ROVEREDO IN PIANO, PORDENONE.
With reference to the organized site visit scheduled for 28 May 2026 at 09.30 AM, all prospective offerors will be required to submit the names of all attendees (not to exceed two (2) per company) by Tuesday May 26, 2026 at 02.00 PM (LOCAL TIME)
to BOTH the Points of Contact (POCs) below:
OFFERORS MUST HAVE AN ACTIVE SAM (SYSTEM FOR AWARD MANAGEMENT) REGISTRATION AT THE TIME OF PROPOSAL SUBMITTAL AND AWARD.
WORK SHALL BE PERFORMED IN COMPLIANCE WITH D.Lgs. 81/2008
THE DUE DATE TO SUBMIT QUESTIONS AGAINST THIS SOLICITATION IS 05 JUNE 2026 AT 01 PM LOCAL TIME
The Department of the Air Force, specifically the 31st Contracting Squadron, has issued a combined synopsis and solicitation for project ASHE 22-1058 to repair doors at the Zulu Loop first-generation Protected Aircraft Shelters (PASs) located at Aviano Air Base in Italy. This requirement involves maintenance of other airfield structures under PSC Z1BZ and is classified under NAICS code 238190, Other Foundation, Structure, and Building Exterior Contractors. Interested vendors must possess a current SOA certification for category OS18A and maintain an active System for Award Management (SAM) registration at the time of proposal submission and award.
The scope of work requires the completion of repairs on a lump-sum basis, with the contractor responsible for calculating and performing all quantities of work necessary to deliver a complete project. All performance must comply with Italian legislative decree D.Lgs. 81/2008. Technical specifications and work items are detailed across 11 attachments, which include a construction cost breakdown, shop drawings for pilot project steel support structures, and formal solicitation amendments.
The response deadline for solicitation FA568226Q0005 is July 2, 2026, at 2:00 PM local time. The government conducted an organized site visit at the LVIS Gate flightline area in Roveredo in Piano, Pordenone, on June 12, 2026. A Question and Answer document was formally published on June 11, 2026, following the established inquiry period. Sara Giacomello is the primary point of contact for this requirement at Aviano Air Base.