Name | Type | Posted | Actions |
|---|---|---|---|
Tab 3. HAFB TTP Concrete Specs.docx | DOCX | Apr 6, 2026 | |
Tab 4. HAFB TTP Asphalt Specs.docx | DOCX | Apr 6, 2026 | |
Tab 5. HAFB TTP Prime Coat Specs.docx | DOCX | Apr 6, 2026 | |
Solicitation - FA480126Q0005.pdf | Mar 24, 2026 | ||
Tab 9. Base Course SOW.docx | DOCX | Mar 24, 2026 |
Raw Materials
Contact and place of performance
Johnathan Wright
Holloman Air Force Base, NM 88330
USA
Base Course: 823 RHS requires 2500 tons of Base Course material (3/4", 143.6 PCF, +80 CBR) for training operations on Holloman AFB. Deliveries of material must be accompanied by copies of certified waybills and delivery tickets. Interested parties who submit a bid must also submit laboratory test reports proving that their proposed materials meet the American Society of Testing and Materials standards (ASTM). Pr...
View moreDesired delivery start date is 11 August 2026.
PLEASE see attached Solicitation and SOW.
QUESTIONS: The asphalt spec section that was included in the solicitation today is for a 75 blow mix. The line item in the solicitation calls for a P401 mix and has not been updated. Could you please clarify which mix design is being requested? The asphalt spec section that was included in the solicitation today is for a 75 blow mix. The line item in the solicitation calls for a P401 mix and has not been updated. Could you please clarify which mix design is being requested?
ANSWER: I apologize for the confusion; we will only be going with the P401 Mix. Thank you!!
The Department of the Air Force, specifically the 49 CONS PK at Holloman Air Force Base, New Mexico, has issued solicitation FA480126Q0005 for the procurement of raw construction materials to support 823 RHS training operations. The requirement is classified under NAICS 327320, Ready-Mix Concrete Manufacturing, and PSC 5610, Mineral Construction Materials, Bulk. This opportunity is designated as an SBA (Small Business Administration) set-aside. Interested parties must submit responses by the deadline of April 8, 2026, and provide laboratory test reports proving that materials meet American Society of Testing and Materials (ASTM) standards, specifically conforming to ASTM D75/D75M.
The scope of work includes the delivery of 2,500 tons of base course material (3/4-inch, 143.6 PCF, +80 CBR), approximately 2,100 cubic yards of wet concrete mix (Type V Cement, 5,000-PSI rated), 350 tons of P401 Hot Mix Asphalt, and 380 gallons of asphalt prime coat oil. Material deliveries must be accompanied by certified waybills and delivery tickets. The government will perform initial testing upon receipt of the first delivery for each source or batch to ensure compliance with the Statement of Work.
The desired delivery schedule begins with the base course material on May 11, 2026, followed by the wet concrete mix on June 15, 2026, and the asphalt and prime coat on August 11, 2026. Supporting documentation for the requirement includes five attachments: the primary solicitation PDF, a Statement of Work for the base course, and specific technical specifications for the concrete, asphalt, and prime coat. Johnathan Wright is the designated point of contact for this solicitation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.