No attachments available.
SPE4A724R0188 - 6150 - CABLE ASSEMBLY, POWER, ELECTRICAL/ PARENT WSDC FOR ALL ARMY MRAP WSDCs
Contact and place of performance
Thuy Ho
Richmond, VA 23237
USA
NSN: 6150-01-022-6004; CABLE ASSEMBLY, POWER, ELECTRICAL; WSIC: F; IQC PR: 1000178233; Issue Date: 11/17/2023; closing Date: 12/17/2023 THIS SOLICITATION WILL RESULT IN AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS. THE ESTIMATED ANNUAL QUANITTY IS 1446 EACH; THE MINIMUM DELIVERY ORDER QUANTITY IS 362; THE MEXIMUM DELIVERY ORDER QUANTITY IS 1446. THE DELIVERY DATE WILL BE 24...
View moreDLA Aviation is issuing a pre-solicitation for a five-year indefinite quantity contract for electrical power cable assemblies, identified by NSN 6150-01-022-6004. This procurement supports the parent Weapon System Designator Code (WSDC) for all Army Mine Resistant Ambush Protected (MRAP) vehicles. The contract features an estimated annual quantity of 1,446 units, with a minimum delivery order quantity of 362 and a maximum of 1,446. Performance is based in Richmond, Virginia, and the evaluation for award will equally weigh price, past performance, and delivery.
The solicitation is a DLA direct procurement designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Classification for this requirement falls under NAICS 334419, Other Electronic Component Manufacturing, and PSC 6150, Miscellaneous Electric Power and Distribution Equipment. Contractor first article testing is required, with the test report due 120 days after receipt of order. Production units must be delivered within 60 days following government approval of the test report, totaling a 240-day delivery schedule. Inspection and acceptance occur at origin with FOB destination terms.
The formal solicitation (SPE4A724R0188) is scheduled for release on or around November 17, 2023, with a response deadline of December 17, 2023. Responsible sources must submit written quotes for consideration. Thuy Ho serves as the primary point of contact for this requirement. The final award decision may incorporate price, past performance, Supplier Performance Risk System (SPRS) scores, and other evaluation factors detailed in the forthcoming solicitation documents.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.