Name | Type | Posted | Actions |
|---|---|---|---|
https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4139690&FileName=36C79118R0002-003.docx | LINK | Mar 9, 2018 | |
https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4091873&FileName=36C79118R0002-002.docx | LINK | Feb 16, 2018 | |
https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4091684&FileName=36C79118R0002-000.docx | LINK | Feb 16, 2018 | |
https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4091685&FileName=36C79118R0002-001.pdf | LINK | Feb 16, 2018 |
65--Pedometers Stand Alone, Bluetooth Amendment 2 - delete note regarding battery not installed in Minimum technical requirements and product description on pages 9 & 10
Contact and place of performance
Josephine P Helms Contract Specialist 303-273-6227 Josephine Helms, Contract Specialist
Not specified
The purpose of this Amendment is to delete a restrictive requirement listed in the Combined Synopsis/Solicitation. Pages nine (9) and ten (10) state the following under Minimum technical requirements and product description for each CLIN: *NOTE: The supplied battery is for initial use and should not be installed in the unit. Per Amendment 2 this note is hereby deleted / removed. Pedometers only need to be battery powered without consideration of how the battery is installed.
The Department of Veterans Affairs is seeking the procurement of stand-alone and Bluetooth-enabled pedometers under solicitation 36C79118R0002. This combined synopsis and solicitation is categorized under PSC 65 and NAICS 339112, Surgical and Medical Instrument Manufacturing. The primary purpose of the current amendment is to revise the minimum technical requirements and product descriptions originally outlined for each contract line item. Specifically, the agency has removed a prior restriction requiring that batteries not be installed in the units upon delivery; pedometers are now required to be battery-powered regardless of the installation status of the battery.
Responses to this federal opportunity are due by March 16, 2018. Josephine P. Helms serves as the primary contract specialist for this requirement. The notice was published on February 16, 2018, and received its most recent update on March 9, 2018. There are currently no attachments associated with this notice on the source platform.