Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 31, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 31, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 31, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911S225U0587 | LINK | Mar 31, 2025 |
Bulk Ice Purchase with Reefer Storage
Contact and place of performance
Angela Graham
Not specified
Material Code: 263B NAICS:312113 PSC: 8950 Requested Specification: Bulk Crushed or Cubed Ice Purchase with Reefer Storage Period of Performance: 18 Jun - 24 July 2025 Location: Ice shall be delivered to BLDG 3140 (SSMO) on JBMDL, NJ. (Google Map location: 3145 County Rd616, Fort Dix, NJ 08640: 29FC+HH Fort Dix, Pemberton Township, NJ) See attached map, building is label TISA. Quantity: 110,000 pounds of bagged crush...
View moreThe Department of the Army, MICC-Fort Drum, has issued a combined synopsis/solicitation under solicitation number W911S225U0587 for the procurement of bulk ice and refrigerated storage. This requirement is categorized under NAICS code 312113 Ice Manufacturing and PSC 8950 Condiments and Related Products. The opportunity is designated as a Small Business Administration (SBA) set-aside, and responses are due by April 30, 2025.
The scope of work involves providing 110,000 pounds of bagged crushed, cubed, or nugget ice suitable for human consumption and packaged in 20-pound bags. The performance period runs from June 18 through July 24, 2025, with delivery to Building 3140 at Joint Base McGuire-Dix-Lakehurst (JBMDL) in New Jersey. The contractor is responsible for transporting the ice at temperatures of 0°F or lower and securing base access at least one week prior to the start date.
In addition to the ice supply, the contractor must provide three 53-foot lockable reefer trailers at the delivery site. Two trailers will be used for bulk storage of the palleted ice, while the third must remain empty. These trailers must be compatible with 208-volt, 3-phase, 60-amp electrical service and align with the facility's loading dock height for forklift accessibility. The contractor is required to maintain these trailers for the duration of the performance period and provide a 24-hour emergency contact for any necessary repairs or replacements. All trailers must be removed by 3:00 PM EST on July 24, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.