Name | Type | Posted | Actions |
|---|---|---|---|
S06_36C78625R0022 Amendment 0001.pdf | Mar 24, 2025 | ||
S02_Attachment 1_Headstone Maintenance Scope of Work Dallas Fort Worth.pdf | Feb 25, 2025 | ||
Attachment 2_DB Wage Determination WD TX20250033.pdf | Feb 23, 2025 | ||
S02_Attachment 1_Headstone Maintenance Scope of Work JBNC.pdf | Feb 23, 2025 | ||
S02_IFB 36C78625R0022.pdf | Feb 23, 2025 |
Z2AA--Headstone Maintenance Dallas Fort Worth
Contact and place of performance
Shane Hilts
Not specified
PRICE SCHEDULE Item No Description Qty Unit of Measure Unit Price Total 0001 The contractor shall provide all transportation, tools, materials, components, permits, license, labor, and supervision required to set new initial upright headstones in accordance with the attached Scope of Work. Not to Exceed 2700 headstones EA Davis-Bacon Wage Determination No: MO20240001 1/19/2024 is applicable to this line item 2,700 EA...
View moreThe Department of Veterans Affairs has issued solicitation 36C78625R0022 for headstone maintenance services at the Dallas-Fort Worth National Cemetery. This requirement falls under NAICS code 238990, All Other Specialty Trade Contractors, and PSC Z2AA, which covers the Repair or Alteration of Office Buildings. The contractor is responsible for providing all transportation, tools, materials, components, permits, licenses, labor, and supervision necessary to execute a range of cemetery maintenance tasks. Proposals are due by March 25, 2025, and Shane Hilts is the primary point of contact for this requirement.
The scope of work encompasses the setting of up to 2,700 new initial upright headstones and 2,100 replacement upright headstones, alongside a small number of flat marker installations. Maintenance requirements also include the cleaning of up to 30,000 headstones, the raise and realignment of 2,000 headstones, and the fine-tune alignment of an additional 30,000 headstones. Work must be performed in accordance with the provided scopes of work, with specific tasks subject to either Davis-Bacon Wage Determinations or the Service Contract Act.
The solicitation documentation includes five attachments: the primary solicitation document, an amendment issued on March 24, 2025, a Davis-Bacon wage determination, and scope of work documents for Dallas-Fort Worth and JBNC. All work is to be completed as specified in the price schedule, which outlines the maximum quantities for each maintenance and installation category. Management of these tasks ensures the upkeep and orderly appearance of the cemetery grounds.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.