Name | Type | Posted | Actions |
|---|---|---|---|
Additional Window photos.pdf | Jun 11, 2026 | ||
II.F. N6660426Q0291 Amendment 00002.pdf | Jun 9, 2026 | ||
Davis Bacon WD 18 May 2026.pdf | Jun 2, 2026 | ||
(REV 1) Building 68 - Room 136 Renovation - Design.pdf | Jun 2, 2026 | ||
(REV 1) BLDG 68 Room 136 Renovation - SPEC.pdf | Jun 2, 2026 | ||
Attachment_5_ Hazmat usage log.pdf | May 12, 2026 | ||
N6660426Q0291 .pdf | May 12, 2026 | ||
Attachment_7_SITE VISIT INSTRUCTIONS .pdf | May 12, 2026 | ||
Attachment_6_Generator usage log.pdf | May 12, 2026 | ||
Attachment_1_ B68 Specification.pdf | May 12, 2026 | ||
Attachment_2_ Drawings_25-031.pdf | May 12, 2026 | ||
Attachment_3_Hazmat Study B68_Redacted.pdf | May 12, 2026 | ||
Attachment_4_Davis Bacon WD 1_30_26.pdf | May 12, 2026 |
Construction - NUWCDIVNPT B68 Rm 136 Renovation Project
The Naval Undersea Warfare Center (NUWC) Division Newport is soliciting proposals for the renovation of Room 136 in Building 68. This project, solicitation N6660426Q0291, is a small business set-aside with a 120-day performance period. Work is divided into two CLINs: the physical renovation and the delivery of submittals. Amendment 0002 extended the response deadline to June 24, 2026, and added 22 technical clarifications regarding lead-based paint abatement, window materials, and electrical configurations. Evaluation follows a Lowest Price Technically Acceptable (LPTA) model, assessing technical capability, past performance, and price. Active SAM.gov registration is required for award and to access controlled documents. The contract includes bonding requirements and liquidated damages of $200 per day for performance delays. NUWC Division Newport is renovating Room 136 in Building 68 under solicitation N6660426Q0291. Electrical upgrades include a 100-foot feeder route from PDP-1 to Room 136 using a 75A spare breaker.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Michael Ouellette
Newport, RI 02841
USA
PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED. Amendment 0001 6/2/2026: The purpose of this Amendment is to: Replace Attachment #3 with revised version dated 18 May 2026. Answer RFI 001 as seen below. RFI 001 1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial rep...
View more3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active.
A3. Leak is no longer active. No repairs to roof are required.
4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations?
A4. See Revised Specifications (REV 1).
5. There is no spec for the glass for the windows. Will a spec section for the glass be made available?
A5. See Revised Specifications (REV 1).
6. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project?
A6. Out-of-State is Allowed.
7. Are electric man-lifts permitted for use on this project?
A7. Yes, however, it might be difficult getting a man lift in the area of work.
All other solicitation terms and conditions remain unchanged.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Please see N6660426Q0291 and all attachments for complete requirement details.
Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.
Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.
A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.
You must request access to the attachment by clicking on its title and providing the reason you need access.
You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.
Your entity is responsible for managing the documents in accordance with prescribed directives.
https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a
Please see Amendment 0002 attached. Additional Photos attached.