Name | Type | Posted | Actions |
|---|---|---|---|
AbstractofBids.xls | XLS | Jul 9, 2014 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9115114B0021 | LINK | Jul 3, 2014 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9115114B0021 | LINK | Jun 24, 2014 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9115114B0021 | LINK | Jun 19, 2014 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9115114B0021 | LINK | May 23, 2014 |
Y--Facilities Reduction Program
Contact and place of performance
Amber Coyne, 254-287-6136 MICC - Fort Hood
Not specified
No narrative description provided for this notice.
The Mission and Installation Contracting Command (MICC) at Fort Hood, under the Department of the Army, issued this solicitation for the Facilities Reduction Program. Identified by solicitation number W9115114B0021, the procurement was categorized under NAICS 238910 for Site Preparation Contractors and PSC code Y for construction of structures and facilities. The requirement was designated as an SBA set-aside.
The solicitation was published on May 5, 2014, with a formal response deadline of July 8, 2014. Administrative oversight for the project was provided by Amber Coyne at the MICC-FDO Fort Hood office. Following the deadline, an abstract of bids was documented in an XLS file attached to the notice on July 9, 2014.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.