Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P2026R0045_Amd_0005.pdf | Jun 5, 2026 | ||
P-0037313_VOYA_Pavement_Preservation_Geotechnical_Report_0004.pdf | Jun 3, 2026 | ||
Sol_140P2026R0045_Amd_0004.pdf | Jun 3, 2026 | ||
Sol_140P2026R0045_Amd_0003.pdf | May 28, 2026 | ||
Sol_140P2026R0045_Amd_0002.pdf | May 11, 2026 | ||
Sol_140P2026R0045_Amd_0001.pdf | May 8, 2026 | ||
B08_Attachment_3_Drawings__VOYA_Pavement_Restoration.pdf | May 7, 2026 | ||
B08_Conformed_Solicitation_140P2026R0045pdf.pdf | May 7, 2026 | ||
Sol_140P2026R0045.pdf | May 7, 2026 | ||
B08_Attachment_2_VOYA_335009_Pavement_Preservation_Specifications.pdf | May 7, 2026 | ||
B08_Attachment_7_Past_Performance_Questionnaire.docx | DOCX | May 7, 2026 | |
B08_Attachment_1_ContractPriceSchedule_VOYA_335009.pdf | May 7, 2026 | ||
B08_Attachment_6_Wage_Determination_MN20260231.pdf | May 7, 2026 | ||
B08_Attachment_5_Subcontract_Percentage_Worksheet.xlsx | XLSX | May 7, 2026 | |
B08_Attachment_4_General_Refrences.pdf | May 7, 2026 |
Y--VOYA 335009 N191 REHAB RAINY AND ASH
The National Park Service is soliciting proposals for the VOYA 335009 Pavement Preservation project at Voyageurs National Park. This requirement involves milling and overlaying approximately 100,000 square yards of asphalt across the Rainy Lake and Ash River visitor center roads, parking lots, and walkways. The project is a total small business set-aside under NAICS code 237310, Highway, Street, and Bridge Construction, and includes both base requirements and five optional line items for additional overlooks and pedestrian paths. The solicitation package includes a conformed version that integrates five amendments. These updates clarified evaluation factors, such as the separation of Project Experience from Past Performance, and established operational constraints including single-lane traffic maintenance and seasonal no-work periods for 2026 and 2027. A geotechnical report and 53 pages of construction drawings provide the technical basis for the required mill and overlay, reconstruction, and subgrade preparation. The solicitation package includes a conformed document integrating five amendments issued in mid-2026. These updates corrected the proposal deadline and added a geotechnical report. Technical work is guided by 53 pages of drawings and specifications based on Minnesota Department of Transportation standards. This project involves rehabilitating roads and parking areas at Rainy Lake and Ash River. The scope includes milling and overlaying 4.86 miles of roadway, replacing asphalt in two parking lots, and milling and overlaying six others. It also includes replacing 1,200 square feet of concrete walkway and installing ADA-compliant parking and signage. Work is expected to start after a winter pause following a late September 2026 award.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Dyer, Rachel
Not specified
VOYA 335009 N191 REHAB RAINY AND ASH