Name | Type | Posted | Actions |
|---|---|---|---|
A23 - BRIP IA PreBid Site Visit Signin Sheet_01July2025.pdf | Jul 18, 2025 | ||
A23 - BRIP IA PreBid Site Visit Signin Sheet_05June2025.pdf | Jul 18, 2025 | ||
A22 - ATTACHMENT F - Redacted_Phase I Report.pdf | Jun 27, 2025 | ||
A22 - ATTACHMENT H Redacted_Phase III Report.pdf | Jun 27, 2025 | ||
A22 - W912EK25R0007_AMND 0002.pdf | Jun 27, 2025 | ||
A22 - ATTACHMENT G - Redacted_Phase II Report.pdf | Jun 27, 2025 | ||
A22 - ATTACHMENT A - PAST PERFORMANCE QUESTIONNAIRE_Rev1.pdf | Jun 27, 2025 | ||
https://dodprocurementtoolbox.com/ | LINK | May 16, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 16, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 16, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EK25R0007¬iceType=SolicitationNotice | LINK | May 16, 2025 |
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Contact and place of performance
Samantha Johanson
Joliet, IL 60436
USA
The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A. Project Description: The work includes, but is not limited to, construction of aquatic nuisance species (ANS) deterrents: Automated Barge Clearing Deterrent (ABCD); Bubble Curtain Det...
View moreThe U.S. Army Corps of Engineers, Rock Island District, is soliciting proposals for Increment 1-A of the Brandon Road Interbasin Project in Joliet, Illinois. This unrestricted solicitation, identified as W912EK25R0007, will be awarded based on a best-value trade-off process for the construction of aquatic nuisance species (ANS) deterrents, including an automated barge clearing deterrent, a bubble curtain deterrent, and an acoustic deterrent. The scope of work involves extensive civil engineering and construction activities, such as underwater rock and sediment excavation within the short engineered channel, directional drilling, sheet pile work, and the installation of fabricated building systems. Supporting infrastructure requirements include floating docks, boat ramps, asphalt paving, riprap placement, and the construction of access roads and support facilities.
Performance requires a broad range of technical services, including electrical, mechanical, plumbing, and structural work, as well as the implementation of cybersecurity and electronic security systems. The project further encompasses instrumentation and monitoring, site restoration, generator installation, and the application of architectural finishes and specialties. This requirement is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Y1KA for Construction of Dams. The estimated project value is between $100,000,000 and $250,000,000, and a Project Labor Agreement (PLA) is required.
Submissions are due by August 28, 2025. Samantha Johanson serves as the primary point of contact for this requirement. Technical and administrative updates have been managed through six amendments, which provided updated plans and specifications, revised wage determinations, and additional geotechnical reference documents. Associated documentation includes seven attachments, featuring site visit sign-in sheets and redacted geotechnical reports. All construction must adhere to the specified technical approach and past performance standards detailed in the solicitation instructions.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.