Name | Type | Posted | Actions |
|---|---|---|---|
B09_-_RFI_Q_A_0002.pdf | Jun 10, 2026 | ||
Sol_140FS126Q0104_Amd_0002.pdf | Jun 10, 2026 | ||
B08_-_Corrected_Offer_Evaluation_Information_0001.pdf | Jun 1, 2026 | ||
Sol_140FS126Q0104_Amd_0001.pdf | Jun 1, 2026 | ||
A06_-_Bid_Schedule___Offer_Evaluation_Information.pdf | May 22, 2026 | ||
B08_-_140FS126Q0104_Solicitation_Package.pdf | May 22, 2026 | ||
A04_-_PWS_Arctic_NWR_Big_Ram_Lake_testing.pdf | May 22, 2026 | ||
Sol_140FS126Q0104.pdf | May 22, 2026 |
F--AK ARCTIC NWR BIG RAM LAKE Soil & Hazardous Materi
The U.S. Fish and Wildlife Service (FWS) is seeking soil and hazardous material evaluation services at Big Ram Lake in the Arctic National Wildlife Refuge (NWR). The work involves investigating a suspected aviation gasoline (AVGAS) spill and conducting hazardous material assessments for asbestos, lead-based paint, and PCBs in three buildings scheduled for demolition. This project is a 100% small business set-aside under NAICS 562910. The resulting firm-fixed-price contract will run from June 22, 2026, through December 31, 2026. Because the site is remote and only accessible by float plane, the project requires specialized logistics. Proposals will be evaluated using a Best Value Tradeoff process, where price is the primary factor following a pass/fail technical review of remote-site logistics and regulatory qualifications. Amendment 0001 extended the RFI and quote deadlines and clarified the performance period. Submissions are due by June 14, 2026, and must follow a specific three-PDF email format. This firm-fixed-price contract requires specialized environmental and logistical expertise for a remote site accessible only by float plane. The government will use a Best Value Tradeoff methodology, prioritizing price after a Pass/Fail technical assessment of remote-site logistics. The project is scheduled for completion by December 31, 2026. The U.S. Fish and Wildlife Service is conducting an environmental evaluation at Big Ram Lake in the Arctic National Wildlife Refuge, focusing on a suspected AVGAS spill and hazardous material testing for three buildings marked for demolition. The site is remote and only accessible by float plane, requiring the contractor to manage all transportation for personnel and equipment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Frank, Tanner
Not specified
AK ARCTIC NWR BIG RAM LAKE Soil & Hazardous Material EVALUATION