Name | Type | Posted | Actions |
|---|---|---|---|
36C25026R0062 Amendment 0002.pdf | Jun 5, 2026 | ||
36C25026R0062 Amendment 0001.pdf | May 21, 2026 | ||
Wage Determination MI20260097 05.18.2026.pdf | May 21, 2026 | ||
SPECIFICATIONS 655-26-201 Repaint Water Tower.pdf | May 14, 2026 | ||
SPECIFICATIONS 655-26-201 Repaint Water Tower.pdf | May 13, 2026 | ||
DRAWINGS 655-26-201 Repaint Water Tower.pdf | May 13, 2026 | ||
36C25026R0062 Repaint Water Tower 655-26-101.pdf | May 13, 2026 | ||
Wage Determination MI20260097 01.02.2026.pdf | May 13, 2026 |
655-26-201 Repaint Water Tower
The Department of Veterans Affairs is seeking proposals for Project 655-26-201, which involves repainting the water tower at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan. The work includes washing and overcoating the exterior, updating the VA logo, and performing a full blast and recoat of the interior tank surfaces. The contractor will also perform spot repairs and touch-ups on the interior dry riser. This procurement is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated value between $250,000 and $500,000. The performance period is 90 calendar days. Proposals are due July 9, 2026. A site visit is scheduled for June 16, 2026, and the deadline for technical questions is June 24, 2026. Technical requirements include adherence to SSPC SP 10 and SP 2-3 standards using specified coating systems like Macropoxy 646 and Duraplate UHS. Project 655-26-201 covers the repainting and maintenance of the water tower at the Aleda E. Lutz VA Medical Center. The contractor is responsible for all materials, labor, and supervision needed to complete the work within 90 days. Exterior tasks include washing, overcoating, and logo updates, while the interior requires full blast cleaning and recoating, plus dry riser repairs. The contractor will perform full repainting and maintenance of the water tower at the Aleda E. Lutz VAMC in Saginaw, Michigan. This includes high-pressure washing and overcoating the exterior and updating the VA logo. The interior tank requires full blast cleaning and recoating, along with spot repairs to the dry riser.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Christina Shockey
Saginaw, MI 48602
USA
Contractor shall provide all materials, labor, and supervision repainting of the water tower at the Saginaw VA Medical Center. Exterior is to be washed and overcoated, VA logo is to be updated. Interior coating is to be “full blasted” and recoated. Interior dry riser is to be spot repaired and touch ups as necessary.
The work described above will take place at the VAMC located at 1500 Weiss St., Saginaw, MI 48602, the period of performance for the project will be ninety (90) calendar days.