No attachments available.
Central/Eastern Oregon Road and Bridge Construction IDIQ
Contact and place of performance
Darcy Rapoza
Portland, Oregon
UNITED STATES
**Solicitation posted 1/23/2023. See https://sam.gov/opp/13cc59f478f84f61881a53896413524d/view ** This proposed solicitation is intended for the initial award of multiple Indefinite Delivery/ Indefinite Quantity (IDIQ) contracts for road construction and reconstruction activities to cover multiple projects on the Malheur, Ochoco, Umatilla, Wallowa-Whitman, and Deschutes National Forests. The major categori...
View moreSolicitation will be available for download from sam.gov no earlier than 01/03/2023, but depending on internal agency review process, is likely to be later in January 2023.
Note: prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Offeror will not be considered for award.
The Department of Agriculture is issuing this pre-solicitation notice for the Central/Eastern Oregon Road and Bridge Construction IDIQ, identified by solicitation number 1240BH23R0002. This procurement is classified under NAICS 237310 Highway, Street, and Bridge Construction and PSC Y1LB Construction of Highways, Roads, Streets, Bridges, and Railways. The government intends to award up to 20 Indefinite Delivery/Indefinite Quantity contracts for road construction and reconstruction activities across the Malheur, Ochoco, Umatilla, Wallowa-Whitman, and Deschutes National Forests. The performance period spans five years from the date of award, with a maximum aggregate ceiling of $50,000,000 across all contracts and a $25,000,000 ceiling for each individual contract.
The scope of work encompasses clearing, earthwork, structural embankments, drainage structures, and pit or quarry development. Additional requirements include road base and surfacing, road structure demolition, road obliteration, and the construction of retaining walls and minor bridges. Minor bridge work involves simple span structures equal to or less than 80 feet in length, utilizing superstructures made of timber, precast reinforced concrete, or precast-prestressed concrete. Substructure work may involve various foundation types, including reinforced concrete, timber grade beams, geosynthetic reinforced soil, or driven and drilled steel piling.
The response deadline for this opportunity is February 23, 2023. While the primary place of performance is listed as Portland, Oregon, the projects are distributed across several regional National Forests. Offerors must maintain an active registration in the System for Award Management (SAM) from the time of submission through final payment to remain eligible for award. Darcy Rapoza serves as the point of contact for this notice, which currently includes no associated attachments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.