Name | Type | Posted | Actions |
|---|---|---|---|
366946_MR_DISCARD_DO NOT USE.pdf | May 15, 2026 | ||
EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf | May 15, 2026 | ||
EXHIBIT_3 - 4-3-6A Scope of Work.pdf | May 15, 2026 | ||
EXHIBIT_4_4-3-6A Project Manual 15MAY26.pdf | May 15, 2026 | ||
EXHIBIT_6_PUR-466.pdf | May 15, 2026 | ||
EXHIBIT_7_SARC.pdf | May 15, 2026 | ||
EXHIBIT_8__2025_Construction_Insurance_Requirements.pdf | May 15, 2026 | ||
EXHIBIT_9_FL-55.pdf | May 15, 2026 | ||
EXHIBIT_10_Injury_Illness_Questionaire.pdf | May 15, 2026 | ||
EXHIBIT_11_General_Decision_Number_IL20260008_01.02.2026.pdf | May 15, 2026 | ||
EXHIBIT_12_SF1413-23a.pdf | May 15, 2026 | ||
EXHIBIT_13_Bid_Bond.pdf | May 15, 2026 | ||
EXHIBIT_14_Payment Bond.pdf | May 15, 2026 | ||
EXHIBIT_15_Performance Bond.pdf | May 15, 2026 | ||
EXHIBIT_16_Sample Subcontract.pdf | May 15, 2026 | ||
366946_MR.pdf | May 15, 2026 |
PIP-II Main Ring Crossing Construction
Contact and place of performance
Michele Reynolds
IL 60510
USA
This work scope includes the construction of the project known as PIP-II Main Ring Crossing ISD/Engineering project number 4-3-6. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: June 2, 2026, 10:00a CDT Last Day for Questions: ...
View moreOfferors should contact the owner to obtain access to the drawings.
The Department of Energy, through Fermilab, is soliciting proposals for the construction of the PIP-II Main Ring Crossing, designated as ISD/Engineering project number 4-3-6. This project is classified under NAICS 236210 for Industrial Building Construction and PSC Y1EZ for Construction of Other Industrial Buildings. The work will take place in Illinois and does not have a designated set-aside. Interested parties must submit their proposals by June 25, 2026, at 2:00 PM CDT.
The procurement process includes a pre-proposal meeting and site visit scheduled for June 2, 2026, at 10:00 AM CDT. Site access requires attendees to be U.S. citizens with a REAL ID and to complete an access request form at least seven days in advance. Specific safety and security protocols are in effect for the federal facility, including mandatory personal protective equipment for the site visit and vehicle searches upon entry. The deadline for submitting questions regarding this solicitation is June 11, 2026, at 4:00 PM CDT.
Michele Reynolds serves as the primary point of contact for this solicitation. The solicitation package includes 16 attachments, such as the scope of work, general terms and conditions, a project manual dated May 15, 2026, and various administrative exhibits. Technical drawings associated with the construction scope must be obtained directly from the owner.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.