Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P2026R0015_Amd_0002.pdf | May 27, 2026 | ||
Sol_140P2026R0015_Amd_0001.pdf | May 27, 2026 | ||
B08_Attachment_04_SEKI_332393_Final_SD_Drawings.pdf | Feb 10, 2026 | ||
B08_Attachment_05_NPS_Housing_WASO_Bldg_2___Garage_Drawings.pdf | Feb 10, 2026 | ||
B08_Attachment_06_CA20260009_DOL_Wage_Determination.pdf | Feb 10, 2026 | ||
B08_Attachment_01_SEKI_332393_FINAL_DB-RFP_SOW_8_18_2025.pdf | Feb 10, 2026 | ||
B08_Attachment_03_SEKI_332393_Geotech_Eval.pdf | Feb 10, 2026 | ||
B08_140P2026R0015.pdf | Feb 10, 2026 | ||
Sol_140P2026R0015.pdf | Feb 10, 2026 | ||
B08_Attachment_07_Proposal_Submission_Package_SEKI.docx | DOCX | Feb 10, 2026 | |
B08_Attachment_02_SEKI_332393_Final_SD_BOD_Report.pdf | Feb 10, 2026 |
54--SEKI 332393 - Grant Grove Replace Burned Structure
Contact and place of performance
Jasper, Tony
Not specified
The National Park Service is soliciting proposals for project SEKI 332393 to replace burned structures at Grant Grove. This procurement is being conducted under the U.S. Fish & Wildlife Design-Build Multiple Award Task Order Contract (MATOC), and eligibility is limited to current MATOC holders within the State of California pool. The requirement is classified under NAICS 236116 for New Multifamily Housing Construction (except For-Sale Builders) and PSC 5410 for PREFABRICATED AND PORTABLE BUILDINGS.
This solicitation, identified by number 140P2026R0015, is designated as an SBA Small Business Administration set-aside. Tony Jasper is the point of contact for this requirement, and all responses must be submitted by the deadline of June 11, 2026. The notice was originally published on February 10, 2026, and received its most recent update on May 27, 2026.
The project documentation includes 11 attachments such as a statement of work, final design drawings, and National Park Service housing drawings for building and garage structures. The solicitation package also contains Department of Labor wage determinations and two formal amendments issued in May 2026. These materials provide the necessary specifications for the design-build replacement of the burned structures.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.