Name | Type | Posted | Actions |
|---|---|---|---|
DR_0684A0004_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0684D0000_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0684B0000_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0714L0000_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0684A0000_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0684A0001_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0714H1003_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0731E1000_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0714H1004_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0714H1005_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0729A0000_59678_-_001_001.PDF | May 26, 2026 | ||
DR_0737A0000_59678_-_001_001.PDF | May 26, 2026 | ||
PIPEFITTERS TOOL KIT SUPPLEMENTAL TDPL.pdf | May 26, 2026 | ||
Instructions for Navigating a 3Di PDF.pdf | May 26, 2026 | ||
Sources Sought Survey_NSN 5180-00-596-1509_PSTK MAY 2026.docx | DOCX | May 26, 2026 |
Sources Sought: NSN 5180-00-596-1509, Toolkits Pipefitter Supplement (PSTK)
Sources Sought: NSN 5180-00-596-1509, Toolkits Pipefitter Supplement (PSTK): The Army Contracting Command-Detroit Arsenal (ACC-DTA) is conducting market research for the manufacturing and assembly of the Pipefitter Supplemental Tool Kit (PSTK), NSN 5180-00-596-1509. This procurement involves a portable set of specialized hand tools for field-level maintenance and construction of piping systems.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Meika Cole
MI
USA
Army Contracting Command-Detroit Arsenal (DTA) The Government is conducting market research to identify potential sources capable of manufacturing and assembling the Tool Kit, Pipefitter Supplemental (PSTK) (NSN 5180-00-596-1509, P/N 0684A0000:59678). This requirement is a comprehensive, portable Set, Kit, and Outfit (SKO) consisting of specialized hand tools—such as cutters, reamers, threaders, and heavy...
View morea. Navigate to https://www.SAM.gov
b. Search for the sources sought title NSN 5180-00-596-1509: Toolkit, Pipefitter Supplemental
c. Click on the attachments
d. Request access to this document
e. Send your approved DD Form 2345 via e-mail to the following personnel:
Meika Cole, Contract Specialist, ACC-DTA; Email: [email protected]
Access will be granted, pending verification of the contractor’s active certification. NOTE: The contractor POC that requested TDP access via SAM must be listed as the primary or alternate data custodian on the DD Form 2345 to be granted access.
If the vendor does not have a current certification, they must submit a DD Form 2345 to the United States/Canada Joint Certification Office, along with copies of all supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx. Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, the vendor may request access to the TDP as described herein.
Upon completion of the purposes for which Government technical data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed. Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
Meika Cole, Contract Specialist
E-mail: [email protected]
Subject Line: NSN 5180-00-596-1509: Toolkit, Pipefitter Supplemental