No attachments available.
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building)
Contact and place of performance
Andre Casiano
Oklahoma City, OK 73169
USA
*********************THIS IS A MARKET SURVEY ONLY******************** - This is not a Screening Information Request or Request for Proposals of any kind; - The FAA is not seeking or accepting unsolicited proposals; - The FAA will no t pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interest...
View more2. Market Survey Response should include the following:
a. Capability Statement - This document should identify:
- Type of services provided by firm,
- Size and type of services provided on previous government/private sector contracts
- Number of years in business
- Small Business Size Status to include applicable small business socio-economic status
- Current SAM.gov Registration status and SAM.gov UEI
b. Brief information (Agency or Customer/Dollar Amount/Scope/etc) regarding past projects respondent has completed with similar magnitude and work that is identified in this Market Survey
All responses to this market survey must be received by June 22, 2026, 3:00 p.m. CT. All capability statements must be submitted by email to: [email protected]
The Federal Aviation Administration is conducting a market survey under solicitation number MrktSrvy-IWTPUpgrade-MMAC to identify vendors for the Mike Monroney Aeronautical Center Industrial Wastewater Treatment Plant upgrade in Oklahoma City, Oklahoma. This project, estimated between $10,000,000 and $20,000,000, involves the demolition of the existing treatment plant and the construction of a new 4,900-gross-square-foot, single-story pre-engineered metal building. The new facility will house industrial waste treatment processing areas, office spaces, equalization tanks, a storm shelter restroom, and utility support spaces. The requirement is classified under NAICS 237110, Water and Sewer Line and Related Structures Construction.
Infrastructure work includes replacing lift stations #1, 3, and 4 with new double-walled fiberglass wet wells for secondary containment, while lift stations #2 and #5 will be demolished and filled. Once the new plant is operational and waste flow is diverted, the existing facility and its concrete containment trench will be removed. New four-inch inner diameter by six-inch outer diameter double-walled CPVC force main piping will be installed via direct bury along the path of the removed trench.
Responses to this market survey must be submitted to Andre Casiano via email by June 22, 2026, at 3:00 p.m. CT. Submittals should include a capability statement detailing the firm’s services, years in business, small business socio-economic status, and SAM.gov Unique Entity ID. Additionally, respondents must provide brief information on past projects of similar magnitude and scope, including customer names and dollar amounts. This notice is for market research purposes only and is not a request for proposals.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.