Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W90VN726RA016¬iceType=CombinedSynopsisSolicitation | LINK | Apr 30, 2026 |
CY26LCS, MATOC NON-WORK PLAN, W90VN726RA016, Upgrade Drainage
Contact and place of performance
KYONG KO
Not specified
CY26 LCS, MATOCLCS NON-WORK PLAN TASK ORDER_UPGRADE DRAINAGE AROUND B2035, KUNSAN AB.The contractor shall provide all supervision, labor, tools, parts, materials and transportation necessary to provide service as stated in the Statement of Work and Drawings herein.
The Department of the Army, 630th Support Detachment, has issued this combined synopsis/solicitation under solicitation number W90VN726RA016 for the procurement of drainage system upgrades. Specifically, the contractor is required to provide all supervision, labor, tools, parts, materials, and transportation necessary to upgrade the drainage around Building 2035 at Kunsan Air Base. This project is designated as a MATOC LCS non-work plan task order, with the scope of work detailed in the provided statement of work and drawings.
The procurement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z1NZ for Maintenance of Other Utilities. There is no set-aside mentioned in the provided metadata. Responses to this solicitation are due by May 22, 2026. The point of contact for this requirement is Kyong Ko. One attachment, an unnamed PDF file, was posted on April 30, 2026, alongside the notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.