Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 4, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 4, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 4, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=FA480326B0007¬iceType=Presolicitation | LINK | Mar 4, 2026 |
Shaw AFB Pointsett LMR Tower
Contact and place of performance
Carlos Griggs
29154
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this contract. No award will be made under this solicitation until funds are available. The Government?s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made avai...
View moreThe Department of the Air Force has issued a pre-solicitation notice under solicitation number FA480326B0007 for the construction of a new 120-foot tower at the Poinsett Range. This project involves replacing an existing structure to increase range coverage and reduce dead spots by installing a new tower, antennas, cables, an ice bridge between the shelter and antenna, and a ground ring integrated with the shelter ground. The contractor is responsible for the planning, design, and management of all activities required to move existing equipment to the new structure while meeting the performance outcomes defined in the Statement of Objectives.
This requirement is classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Y1BG CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES. The opportunity is designated as an SBA (SBA) set-aside with a response deadline of March 20, 2026. Award of this contract is contingent upon the availability of appropriated funds, and the government maintains the right to evaluate performance based on compliance with objectives rather than directing specific construction means and methods. Administrative metadata includes one unnamed PDF attachment posted on March 4, 2026, and identifies Carlos Griggs as the point of contact.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.