Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 2e - AEDC Design Review Flow and Expectations.pdf | Jun 13, 2025 | ||
Attachment 2 - Technical Requirements Document_Amend2.pdf | Jun 13, 2025 | ||
Attachment 12 L-8 - Requirements Matrix_Amend2.pdf | Jun 13, 2025 | ||
Attachment 4 Section L_Amend2.pdf | Jun 13, 2025 | ||
Solicitation Amendment FA910125RB0010002 SF 30.pdf | Jun 13, 2025 | ||
Attachment 1 - Statement of Objectives_Amend2.pdf | Jun 13, 2025 | ||
Attachment 14 Section M_Amend2.pdf | Jun 13, 2025 | ||
Solicitation Amendment FA910125RB0010001 SF 30.pdf | May 22, 2025 | ||
Raw Water Analysis Report 7-13-12.pdf | May 20, 2025 | ||
FA910125RB001 Facility Exhaust System QandA 20May25.pdf | May 20, 2025 | ||
Attachment 2b - Reference Drawings.pdf | Apr 16, 2025 | ||
Attachment 2 - Technical Requirements Document.pdf | Apr 16, 2025 | ||
Attachment 1 - Statement of Objectives.pdf | Apr 16, 2025 | ||
Solicitation - FA910125RB001.pdf | Apr 16, 2025 | ||
Facility Exhaust System RFP Cover Letter.pdf | Apr 16, 2025 | ||
Attachment 2a - Exhaust Boundary Utility Interface.pdf | Apr 16, 2025 | ||
Attachment 11 L-7 Initial Order Pricing Sheet.xlsx | XLSX | Apr 16, 2025 | |
Attachment 3 - DD1423 CDRL Template.pdf | Apr 16, 2025 | ||
Attachment 5 L-1 PPI Tool Instructions.pdf | Apr 16, 2025 | ||
Attachment 14 Section M.pdf | Apr 16, 2025 | ||
Attachment 13 L-9 SB Participation Commitment Document.pdf | Apr 16, 2025 | ||
Attachment 12 L-8 - Requirements Matrix.pdf | Apr 16, 2025 | ||
Attachment 10 L-6 Relevancy Matrix.xlsx | XLSX | Apr 16, 2025 | |
Attachment 9 L-5 Subcontractor Consent Letter.pdf | Apr 16, 2025 | ||
Attachment 7 L-3 PPQ Cover Letter.pdf | Apr 16, 2025 | ||
Attachment 6 L-2 Past and Present Performance Questionnaire.pdf | Apr 16, 2025 | ||
Attachment 2d - Design Submittal Requirements.pdf | Apr 16, 2025 | ||
Attachment 2c - SHE and Eng Standards.pdf | Apr 16, 2025 | ||
Attachment 4 Section L.pdf | Apr 16, 2025 | ||
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 16, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 16, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Apr 16, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=FA910125RB001 | LINK | Apr 16, 2025 |
Facility Exhaust System
Contact and place of performance
Haley Smith
Arnold AFB, TN 37389
USA
13 June 2025 - Amendment 2 is issued revising RFP attachments and extending the proposal due date to 30 June 2025. ***************************************************************************** 22 May 2025 - Amendment 0001 is issued extending the proposal due date for all proposal volumes, including Past Performance, to no later than 16 June 2025 at 2:00pm Central Time. Amendment 0002, incorporating changes from the Q...
View moreThe Department of the Air Force, specifically the Air Force Test Center Arnold Engineering Development Complex, has issued solicitation FA910125RB001 for the design, procurement, and installation of a new facility exhaust system. This acquisition is categorized under NAICS 333248, All Other Industrial Machinery Manufacturing, and PSC 4310, Compressors and Vacuum Pumps. The project, located at Arnold Air Force Base in Tennessee, will be awarded as a single, firm-fixed-priced requirements contract featuring a five-year ordering period. This requirement is being solicited under full and open competition, though it is subject to restrictions regarding foreign ownership and export-controlled items.
Responses are due by June 30, 2025, and must be submitted electronically through the Procurement Integrated Enterprise Environment. This deadline was established via Amendment 2, which also revised several of the 29 total attachments, including the Technical Requirements Document, Statement of Objectives, and Requirements Matrix. Offerors must ensure proposals remain valid for 90 days after submission. While the government intends to award a contract, it notes that funds are not presently available for the effort, and no award will be made until funding is secured.
The primary point of contact for this solicitation is Haley Smith. The acquisition documents include a variety of technical and procedural attachments such as the AEDC Design Review Flow and Expectations and Section L Instructions to Offerors. All participating contractors must be registered and active in the System for Award Management to be eligible for award, and by submitting a proposal, they certify that they are not subject to foreign ownership or control. All technical inquiries and questions regarding the solicitation must be directed to the contracting officer in writing.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.