Name | Type | Posted | Actions |
|---|---|---|---|
W51AA1-25-D-0001 Exhibit 1 - PWS.pdf | May 28, 2026 |
NOTICE OF INTENT TO SOLE SOURCE: IDIQ CEILING INCREASE FOR EPOXY FLOOR REPAIRS
Contact and place of performance
Mark Buonomo
PA 18466
USA
SUBJECT: Notice of Intent to Formally Modify Single-Award IDIQ Contract W51AA1-25-D-0001 to Increase the Contract Ceiling. 1. INTRODUCTION ACC-APG, Tobyhanna Division intends to execute a sole-source bilateral modification to increase the contract ceiling of the single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for flooring repair and replacement services. This contract modification will be e...
View more3. REASON FOR SOLE SOURCE
The Government intends to award this ceiling increase on a sole-source basis to the incumbent contractor, Cinteot, Inc. In accordance with FAR 6.302-1(a)(2)(ii), the incumbent is the only source capable of satisfying this requirement without the Government incurring a Substantial Duplication of Cost and Unacceptable Delays.
4. SUBMISSION INSTRUCTIONS FOR INTERESTED PARTIES
This notice is not a request for competitive proposals. However, interested parties who believe they can satisfy the requirement are invited to submit a capability statement.
Capability statements must be submitted via email to the Contracting Points of Contact (POC) listed below no later than the Response Deadline.
Submissions must include:
Company Name, CAGE Code, and UEI Number.
Proof of active facility access clearances/credentials at Tobyhanna Army Depot or the ability to obtain them.
Evidence of technical capability and immediate mobilization capacity to execute flooring repairs on a rapid-response basis without disrupting active operations.
A determination by the Government not to compete this proposed modification based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement in the future.
The Army Contracting Command-Aberdeen Proving Ground (ACC-APG), Tobyhanna Division, intends to execute a sole-source bilateral modification to increase the ceiling of the existing single-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract W51AA1-25-D-0001. This action, classified under NAICS 238330 Flooring Contractors and PSC Z2AA REPAIR OR ALTERATION OF OFFICE BUILDINGS, involves an increase of $500,000.00 to the cumulative contract ceiling. The modification is necessary to prevent a gap in services after unforeseen emergency maintenance requirements exhausted the current ceiling. There is no set-aside designated for this requirement.
The incumbent contractor, Cinteot, Inc., will continue to provide rapid-response flooring repair, removal, preparation, and installation services at Tobyhanna Army Depot in Pennsylvania. The government has identified the incumbent as the only source capable of satisfying the requirement without causing substantial duplication of costs or unacceptable delays. These services ensure safe and compliant working environments for personnel across the installation.
This special notice, published on May 28, 2026, includes one attachment, a Performance Work Statement, and identifies Mark Buonomo as the point of contact. While this is not a request for competitive proposals, interested parties may submit capability statements by the response deadline of June 11, 2026. Submissions must demonstrate technical capability, immediate mobilization capacity, and the ability to obtain necessary facility access clearances at the depot. All information received will be used to determine whether to conduct a competitive procurement in the future.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.