Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 14, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 14, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 14, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3021¬iceType=CombinedSynopsisSolicitation | LINK | Apr 14, 2026 |
FOAM SPACERS
Contact and place of performance
Tonya Lomon
74501
SPACER, FOAM 5 INCH DIAMETER X 3/4 INCH THICKNESS. MATERIAL IS POLYETHELENE MATERIAL, CLASS 4, GRADE B, TYPE I. MUST MEET ALL REQUIREMENTS OF SPEC A-A-59136 (28 OCT 97) FOR CLASS, GRADE AND TYPE, CERTIFICATE OF CONFORMANCE AND SDS REQUIRED WITH EACH SHIPMENT, ETHAFOAM 220 OR EQUAL. COC/COA MUST INCLUDE MANUFACTURER NAME, PRODUCT NAME/DESCRIPTION, SPECIFICATION, LOT/BATCH NUMBER, MANUFACTURE/EXPIRATION DATE, ANALYTICA...
View moreThe Department of the Army, MICC-Ft. Drum, issued combined synopsis/solicitation W911S226U3021 for the procurement of foam spacers. These spacers must measure five inches in diameter and 3/4 inches in thickness, utilizing Class 4, Grade B, Type I polyethylene material. The products must meet all requirements of specification A-A-59136 for the specified class, grade, and type, and the agency identifies Ethafoam 220 or an equivalent as the standard. This requirement is designated as an SBA SBA set-aside associated with NAICS 325212 for Synthetic Rubber Manufacturing and PSC 8135 for PACKAGING AND PACKING BULK MATERIALS.
Required documentation includes a Safety Data Sheet and a Certificate of Conformance or Certificate of Analysis with each shipment. These certificates must contain the manufacturer name, product description, specification, lot or batch number, manufacture and expiration dates, analytical data, a statement of no change in materials or processes, and an authorized signature. Packaging labels must also display the manufacturer name, product description, lot or batch number, and manufacture and expiration dates. A Certificate of Conformance or Certificate of Analysis must be approved by the MCAAP AO before a contract award is made.
Responses for this opportunity are due by April 21, 2026, and Tonya Lomon is the designated point of contact. The solicitation includes one PDF attachment published on April 14, 2026. All materials must be delivered on or before August 5, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.