Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 3, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 3, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9123725QA063¬iceType=CombinedSynopsisSolicitation | LINK | Sep 3, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 3, 2025 |
Robert C. Byrd Locks and Dam Miter Gate Cylinder
Contact and place of performance
—
25502
Combined Synopsis/Solicitation for Commercial Supplies and ServicesSolicitation Number: W9123725QA063Posting Date: 3 September 2025Federal Acquisition Circular (FAC) Date: 2025-05Product/Service Codes: 8120NAICS Code: 333995Business Size Standard: 800 employeesSet-Aside: 100% Small BusinessGovernment Organization: U.S. Army Corps of Engineers, Huntington DistrictDescription:This is a solicitation for the rebuilding o...
View moreThe U.S. Army Corps of Engineers, Huntington District, issued solicitation W9123725QA063 for the rebuilding of a miter gate operating cylinder used at the Robert C. Byrd Locks and Dam in Apple Grove, West Virginia. This requirement is a 100% small business set-aside (SBA) classified under NAICS code 333995, Fluid Power Cylinder and Actuator Manufacturing, and PSC 8120, Commercial and Industrial Gas Cylinders. The scope of work involves the disassembly, examination, component replacement, fabrication, re-assembly, testing, painting, pickup, and delivery of a tie rod cylinder with a 10-inch diameter bore and a 196 9/16-inch total stroke.
Specific technical requirements include fabricating a new piston, replacing seals and wear rings with Chesterton products, and repairing or re-chroming the piston rod as necessary. The contractor must also remove and replace a stem adapter and install a metal nameplate documenting repair details and spacer dimensions. Following disassembly, the contractor is required to provide a list of recommended additional repairs for potential contract modification before proceeding. Performance is scheduled for completion within 50 days after receipt of order.
This combined synopsis/solicitation was published on September 3, 2025, and updated via amendment on September 9, 2025. Responses are due by September 16, 2025. Award will be based on the best value to the government, and all offerors must be registered in the System for Award Management. Pricing must remain valid for 30 days, and the contractor is responsible for all labor, equipment, and materials necessary to fulfill the requirements.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.