Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P8326Q0029_Amd_0001.pdf | Jun 9, 2026 | ||
WD_OR20260001_2026_01_23.pdf | May 29, 2026 | ||
WD_OR20260003_2026_01_02_HEAVY.pdf | May 29, 2026 | ||
B08_Relevant_Project_Experience_Questionnaire.docx | DOCX | May 29, 2026 | |
Simplified_Construction_Attachment_2_Terms_Provisions_Clauses.docx | DOCX | May 29, 2026 | |
A04_SOW_PMIS_328717.pdf | May 29, 2026 | ||
B08_Attachment_01_READ_ME_FIRST_-_FAQs.docx | DOCX | May 29, 2026 | |
Sol_140P8326Q0029.pdf | May 29, 2026 | ||
B08_Attachment_07_Price_Schedule_and_Forms_to_Submit_with_Quote.docx | DOCX | May 29, 2026 |
N--Two gate replacement, Lewis and Clark NHP
The National Park Service is requesting firm fixed-price quotes to install two government-furnished security gates at Lewis and Clark National Historical Park. The project includes all labor, wiring, trenching, materials, and equipment required for the installation. Key tasks involve demolishing existing structures, excavating for post holes and battery housing, and trenching or boring for electrical conduit over distances of 130 and 170 linear feet. This is a 100% small business set-aside under NAICS 238910 ($19 million size standard). The government plans to award a single contract with a performance period from June 22, 2026, to July 21, 2026. Quotes must be valid for 60 days and are due by June 10, 2026, at 5:00 PM EDT. No formal site visit is planned. Submission requirements include a Price Schedule, a Relevant Project Experience Questionnaire, and adherence to Davis-Bacon Act wage determinations for Clatsop County, Oregon. Amendment 0001 clarifies that the scope includes removing log pilings and concrete pads at the South Netul site. Quotes must be submitted via email to the designated contracting point of contact. The National Park Service is soliciting firm-fixed-price quotes for the installation of two government-furnished automatic security gates at Lewis and Clark National Historical Park. The contractor will provide all labor, equipment, and materials for site preparation, wiring, trenching, and system programming. Work at the South Netul site includes removing existing gates, log pilings, and concrete pads. The scope involves boring or trenching for electrical conduits in 130 and 170 linear foot runs. At the South Netul site, the contractor must remove existing gates, log pilings (palisades), and concrete pads. The government provides archaeological moni…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Hoversten, Hal
Not specified