Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 8, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 8, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 8, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HP25RA028¬iceType=Presolicitation | LINK | Sep 8, 2025 |
North Myrtle Beach Ocean Outfall (17 Ave S)
Contact and place of performance
Evelyn HALLIBURTON
29582
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors,...
View moreThe US Army Corps of Engineers Charleston Office issued a pre-solicitation notice for the North Myrtle Beach Ocean Outfall project at 17th Avenue South in Horry County, South Carolina. Identified under solicitation number W912HP25RA028, the project will be awarded as a firm-fixed-price design-build contract with an estimated magnitude between $25,000,000 and $50,000,000. This requirement falls under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC C1LC, Architect and Engineering- Construction: Tunnels and Subsurface Structures. The final solicitation is anticipated for release between 15 and 30 days after the September 8, 2025, announcement date, with a response deadline of October 31, 2025.
The project scope involves upgrading the stormwater collection and conveyance system in a coastal urban area to improve water quality and control flooding. The contractor will design and construct a stormwater ocean outfall consisting of a large-diameter prestressed concrete cylinder pipe extending approximately 1,200 feet from a landward stormwater quality structure. The pipe will be laid beneath the existing benthic seabed, supported by bedding stone, anchored by large armor stone, and topped with sand. Construction activities include marine piling, the use of a temporary pier, and the installation of a rock-armored nozzle outlet.
Work will be coordinated with a separate landward stormwater upgrade project and must comply with environmental regulations regarding protected species. Construction schedules are subject to restrictions on the beach during sea turtle nesting season, which runs from May 1 to October 31, and must account for potential impacts related to right whale proximity. The contractor is responsible for obtaining all necessary permits prior to the start of construction. Evelyn Halliburton serves as the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.