Name | Type | Posted | Actions |
|---|---|---|---|
Sol_1240BF26Q0049_Amd_0001.pdf | Jun 12, 2026 | ||
C04 Appendix 2 Wrangell Harbor Tow.pdf | Jun 5, 2026 | ||
C04 Appendix 1 Misty Shelter 2026 SITE DEV (1).pdf | Jun 5, 2026 | ||
C04 Attachment 1 Statement of Objectives_Misty Barge Tow Shelter Cove.pdf | Jun 5, 2026 | ||
Sol_1240BF26Q0049.pdf | Jun 5, 2026 |
Misty Barge towing, Tongass National Forest
The Forest Service requires vessel towing services to move the Misty Barge from Winstanley Island in Behm Canal to the Shelter Cove remote dock in Carroll Inlet, near Ketchikan, Alaska. This project involves transporting a 90-ton barracks barge and four floats within the Tongass National Forest. The contractor will provide all labor, equipment, and supervision for the tow and must follow specific moorage plans at the destination. This is a small business set-aside resulting in a firm-fixed-price contract. Amendment 0001 changed the optional tow destination from Shoal Cove to Wrangell Harbor and extended the proposal deadline. Performance is scheduled between June 18, 2026, and July 2, 2026. Technical specifications include a Statement of Objectives, site diagrams, and maritime route maps detailing barge configurations and anchoring requirements. This contract provides maritime towing for the Misty Barge in the Tongass National Forest. The work involves moving a 90-ton barracks barge and four floats from Winstanley Island to the Shelter Cove remote dock. The firm-fixed-price award covers all labor, materials, and equipment for the relocation and moorage. Amendment 0001 updated the optional tow destination to Wrangell Harbor and set the performance period for June 18 through July 2, 2026. Requirements include a 48-hour pre-tow notice and submission of technical and past performance data.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Raymond Padgett III
Ketchikan, AK 99901
USA
The primary scope of this project is to tow the Misty Barge anchored at Winstanley Island in Behm Canal to Shelter Cove remote dock in Carroll Inlet near Ketchikan, Alaska. The Contractor shall furnish all labor, materials, equipment, supervision and transportation to perform all work listed on the schedule of supplies/services.
The purpose of this amendment is to:
1. change the option description from "to Shoal Cove" to Wrangell Harbor.
2. extend offer due date to 18 June 2026, 1200 Alaska Standard time.
3. All other terms and conditions remain unchanged.