Name | Type | Posted | Actions |
|---|---|---|---|
N3904026Q3129 Attachment 1 Wage Determination.pdf | Jun 4, 2026 | ||
N3904026Q3129 Combined Synopsis RFQV2.pdf | Jun 4, 2026 | ||
N3904026Q3129 Attachment 2 Enclosure 2 PNSY OPSEC Contract Requirements 26-075.pdf | Jun 4, 2026 | ||
N3904026Q3129 CDRL Exhibit A.pdf | Jun 4, 2026 | ||
N3904026Q3129 CDRL Exhibit B.pdf | Jun 4, 2026 |
TOP SIDE DIESEL GENERATOR
The Portsmouth Naval Shipyard in Kittery, Maine, is seeking quotes for the rental and maintenance of a 400kVA topside diesel docking generator. This requirement is a small business set-aside under solicitation number N394026Q3129. The performance period includes a six-week base period from December 24, 2026, to February 3, 2027, with a four-week option that could extend services through March 3, 2027. Equipment must meet specific technical standards, including Tier 4 Final emissions compliance, an ungrounded system, and sound attenuation. Submissions must include technical data sheets and certificates of compliance to verify these specifications. Evaluation will be based on technical acceptability, price, and past performance, requiring documentation for at least two previous projects. The contract also involves administrative and security obligations, such as submitting technical manuals and personnel qualification lists as defined in the Contract Data Requirements Lists (CDRLs). The awardee will also be required to follow Operations Security (OPSEC) protocols at the shipyard, including the submission of a formal OPSEC Plan and adherence to restrictions on portable electronic devices. The Portsmouth Naval Shipyard (PNSY) has issued a solicitation for the rental and maintenance of a 400kVA topside diesel docking generator. This is a small business set-aside with a base performance period of six weeks starting December 24, 2026, and a four-week option period extending into March 2027. The Portsmouth Naval Shipyard requires a portable topside diesel generator to provide temporary power for submarine applications. The unit must have a minimum rating of 400kVA (320kW) and will be deployed on top of a submarine at the Kittery facility.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Sarah Thibodeau
Kittery, ME 03904
USA
This requirement is for rental/service of TOPSIDE DIESEL DOCKING GENERATOR for Portsmouth Naval Shipyard in Kittery, Maine. This requirement has a 6-week base period of performance from 12/24/2026 to 02/03/2027 with an option period of 4 weeks from 02/04/2027-03/03/2027.