Name | Type | Posted | Actions |
|---|---|---|---|
AMENDMENT 0002.pdf | Jun 2, 2026 | ||
Amendment 0001 RFI Responses.pdf | May 18, 2026 | ||
Amendment 0001 - Updated Spec.pdf | May 18, 2026 | ||
AMENDMENT 0001.pdf | May 18, 2026 | ||
Attachment D - Request for Information (RFI) Form.xlsx | XLSX | Apr 23, 2026 | |
Attachment C - Bid Schedule.docx | DOCX | Apr 23, 2026 | |
Attachment F - PIEE Vendor Access Instructions.pdf | Apr 23, 2026 | ||
Attachment B - 1783178 PNY RESERVE BASIN FY26 MAINTENANCE DREDGING PLANS.pdf | Apr 23, 2026 | ||
Attachment A - 1783178 PNY RESERVE BASIN FY26 MAINTENANCE DREDGING SPECS.pdf | Apr 23, 2026 | ||
Attachment E - Small Business Subcontracting Plan (SBSP) Template.docx | DOCX | Apr 23, 2026 | |
N4008526B0002.pdf | Apr 23, 2026 | ||
Attachment 1 - Wage Determination PA20260028 01-30-26.docx | DOCX | Apr 23, 2026 | |
Attachment 1 - Wage Determination PA20260028 01-30-26.pdf | Apr 23, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Apr 23, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=N4008526B0002¬iceType=SolicitationNotice | LINK | Apr 23, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 23, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 23, 2026 |
RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY
NAVFACSYSCOM Mid-Atlantic is seeking bids for maintenance dredging at the Philadelphia Navy Yard. The project involves removing approximately 96,611 cubic yards of sediment from the North Side (Wharf N) of the Reserve Basin and the Schuylkill River Access Channel. This work supports Naval Support Activity Mechanicsburg and the Philadelphia Navy Yard Annex by maintaining a minimum depth of -30 feet Mean Lower Low Water (MLLW) for vessel decommissioning. The contract is a firm-fixed-price construction award with a 270-day performance period. Key constraints include a prohibited work window from March 15 to June 31 for fish migration and a requirement for 24/7 operations with a daily production rate of at least 5,000 cubic yards. Amendments have updated the response deadline to August 19, 2026, and modified technical requirements, including the removal of specific disposal site mandates and the waiver of Professional Engineer (P.E.) requirements for Quality Control personnel. Bids must be submitted through the Procurement Integrated Enterprise Environment (PIEE). The technical requirements include using a sealed environmental clamshell bucket and operating 24/7 to meet production goals. Environmental restrictions prohibit dredging from March 15 to June 31 to protect fish migration. Contractors are responsible for sediment disposal at approved offsite facilities and must work around identified 15 KV submarine cables. Contractors must remove and dispose of all artificial obstructions and debris within the project boundaries. Amendments have shifted the disposal requirement to any 'approved offsite facility,' though Biles Island remains the designated site for material from Area RB-A 7/8.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Brittany Cristelli
Philadelphia, PA 19112
USA
The project consists of Maintenance Dredging within the North Side (Wharf N) of Reserve Basin and Schuylkill River Access Channel for the Government sites at the Philadelphia Navy Yard in the Public Works Department Pennsylvania area of responsibility. Maintenance dredging of approximately 96,611 cubic yards of sediment, using a sealed environmental clamshell bucket. Dredging within the Reserve Basin is in support of...
View more