No attachments available.
AUGMENTOR NOZZLE SEGMENT HINGE ASSEMBLY / 86F, C-5 SUPPORT EQUIPMENT
Contact and place of performance
Gladys Brown
Not specified
NSN: 2840-01-095-9494, IQC PR: 1000234876, ITEM: AUGMENTOR NOZZLE SEGMENT HINGE ASSEMBLY THIS PART IS MANUFACTURED BY RTX CORPORATION (CAGE 52661 & 77445) AND PARTS LIFE INC. (CAGE 4MJR3) UNDER PART NUMBER 4056758. THE SOLICITATION WILL BE ISSUED AS A 100% SMALL BUSINESS SET-ASIDE. THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS. THE EST...
View moreA COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT “REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB)” FROM THE MENU UNDER THE TAB “SOLICITATIONS.” THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD. SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR ABOUT JUNE 24, 2026.
The Defense Logistics Agency, DLA Aviation, is seeking to establish an Indefinite Quantity Contract (IQC) for the procurement of augmentor nozzle segment hinge assemblies, identified by NSN 2840-01-095-9494. This requirement supports C-5 aircraft equipment and involves components manufactured under part number 4056758, currently associated with RTX Corporation and Parts Life Inc. The procurement is classified under NAICS 336412 for Aircraft Engine and Engine Parts Manufacturing and PSC 2840 for Gas Turbines and Jet Engines, Aircraft, Prime Moving; and Components. This solicitation is designated as a 100% Small Business Set-Aside (SBA).
The anticipated contract includes a five-year base period with no option years and an estimated annual quantity of 600 units. Contractor first article testing is required, with the test report due 276 days after receipt of order and government review following within 105 days. Production units are scheduled for delivery 276 days after government approval of the first article. Inspection and acceptance terms vary by phase, with first article inspection at origin and acceptance at destination, while production units require both inspection and acceptance at origin. All items are to be delivered FOB destination.
Access to necessary technical data is restricted to contractors certified by the Department of Defense via a DD Form 2345. The solicitation, identified by number SPE4A726R0647-Synopsis, is expected to be issued on or about June 24, 2026, with a formal response deadline of July 24, 2026. Interested parties may track the solicitation through the DLA Internet Bid Board System. The primary point of contact for this pre-solicitation notice is Gladys Brown.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.