56--MAHOGANY CREEK CULVERT SUPPLY
The Bureau of Land Management is procuring specialized construction materials for the Mahogany Creek Culvert project under solicitation 140L2626Q0042. This small business set-aside includes a multi-plate arch culvert, precast concrete footings, a coffer dam, a lifting spreader beam, and 1,100 tons of aggregate. Technical requirements include adherence to FP-24 material standards and structural specifications in the engineering drawings. Amendment 0001 extended the delivery deadline to July 24, 2026, and updated the delivery point for most items to the BLM Salmon Field Office in Salmon, Idaho. Aggregate delivery remains designated for a separate stockpile location identified in the project maps. This procurement focuses on the supply of structural materials for the Mahogany Creek Culvert project. Deliverables must meet FP-24 material standards and AASHTO LRFD Bridge Design Specifications. The Bureau of Land Management requires specific components, including a multi-plate arch culvert and precast concrete footings, with fabrication details provided in engineering drawings. Supply of a multi-plate arch culvert and all necessary assembly hardware.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Fort, Patricia
Not specified
MAHOGANY CREEK CULVERT SUPPLY