Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 0001 W912ES26QA0300001 SF 30.pdf | Mar 4, 2026 | ||
Amendment 0001 Fire Alarm Horn Strobes.pdf | Mar 4, 2026 | ||
Amendment 0001 IMG_1725.JPG | JPG | Mar 4, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Feb 19, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912ES26QA030¬iceType=SolicitationNotice | LINK | Feb 19, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Feb 19, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Feb 19, 2026 |
Office Repairs for Hastings, MN
Contact and place of performance
Justin Rose
Hastings, MN 55033
USA
Posted Amendment 0001, new site visit date 12 March 2026 (see attached for details) The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a �? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and a...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers St. Paul District (W07V ENDIST ST PAUL), is soliciting office repairs for the Hastings Resident Office at Lock and Dam 2 in Hastings, Minnesota. This project addresses flood damage resulting from a frozen and burst copper water pipe. Under solicitation number W912ES26QA030, the contractor is required to remove and replace all damaged materials, including wall base molding, drywall, various types of insulation, water vapor barriers, bathroom wall tiles, stained carpet, ceiling tiles, and LED light panels. All replacement materials must match the existing undamaged components or receive approval from the Contracting Officer.
The scope of work encompasses mechanical and finishing tasks such as repairing the burst water pipe, reconnecting kitchenette plumbing fixtures and the hot water heater, and painting new sheetrock and affected surfaces. Additional requirements include remounting electrical conduit, fire alarm annunciators, and fire extinguishers, as well as testing the fire alarm system for functionality. The contractor must also steam clean the carpet, apply an epoxy floor with non-slip grip in the server room, and conduct air sampling for mold before and after the repair process.
This requirement is designated as a total small business set-aside (SBA) under NAICS code 238310 for Drywall and Insulation Contractors and PSC Z2AA for Repair or Alteration of Office Buildings. Responses are due by March 19, 2026, and a site visit is scheduled for March 12, 2026. Justin Rose serves as the point of contact for this solicitation, which includes four attachments: Amendment 0001 (SF 30), a document regarding fire alarm horn strobes, a project image, and the original solicitation document.