No attachments available.
Z--Multiple Award Construction Contract (MACC), Indefinite Delivery, Indefinite Quantity (IDIQ).
Contact and place of performance
ALFREDO B. ANCHETA JR. Contract Specialist PWD, Bldg 50, Road 382, Blk 342 Juffair, Kingdom of Bahrain DSN: 318 439-8918 Office: (973) 1785-8918 Mobile: (973) 3840-4361
Not specified
This is an IDIQ contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer or his properly authorized representative who will issue written Task Orders to the Contractor. Award of Task Orders will be on a firm fixed price basis. Description of Work The Indefinite Delivery Indefinite Quantity (IDIQ) Mu...
View moreThe Naval Facilities Engineering Systems Command (NAVFAC) Europe Africa Central has issued an award notice for solicitation N3319112R1001, establishing an Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). This contract vehicle covers the design, construction, renovation, and repair of facilities throughout Bahrain and the United Arab Emirates, with the majority of performance localized in Bahrain. Work is categorized under NAICS 236220 for Commercial and Institutional Building Construction and PSC code Z.
The contract structure includes four one-year options, providing a total maximum duration of 60 months or a total value of $10 million, whichever is reached first. Task orders issued under this MACC will utilize design-build, modified design-build, and design-bid-build methods. While the government reserves the right to order work outside of these ranges, task orders are typically expected to fall between $100,000 and $650,000, with most anticipated to range from $100,000 to $300,000. Each awardee is provided a minimum guarantee of $10,000, which is deducted from their first task order award.
Awarded task orders will be firm-fixed-price and require the contractor to furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, and supervision. Although the initial solicitation included plans and specifications for a seed project, subsequent task orders will be issued with individual project-specific requirements. Alfredo B. Ancheta Jr. serves as the contract specialist for this requirement, which was published and updated on October 4, 2012.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.