Construct Air Traffic Control Tower and Base Ops at Robins AFB, GA
Contact and place of performance
Michelle Munn
Not specified
Pre-Solicitation Notice Synopsis For W912HN26BA007 Construct New Air Traffic Control Tower and Base OPS Robins Air Base, GA The U.S. Army Corps of Engineers {USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN26BA007 for Project Number: UHHZ063000, Construct New Air Traffic Control Tower and Base OPS, Robins Air Base, GA Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is antici...
View moreType of Set-Aside: This acquisition is being offered as a 100% Total Small Business Set-Aside.
Construction Magnitude: In accordance with DFAR 236.204, the magnitude of this construction project is anticipated to be between $25,000,000 and $40,000,000.
Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 15 June 2026 and the approximate closing date is on or about 14 July 2026. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted.
Period of Performance: The period of performance including all options is 780 Calendar Days after the issuance of the notice to proceed.
Project Scope: All work necessary to construct a new Air Traffic Control Tower consists of reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, load-bearing masonry for the ground floor and structural steel frame for the tower and sloped standing seam metal roof. Functional areas include offices for personnel, training and briefing area, ready/breakroom, simulator room, elevator, mechanical/electrical/communications rooms, storage area, restrooms, and control cab. The new facility will include appropriate power, 750KW backup generator, heating ventilation and air conditioning, fire and lighting protection, and communications systems. The project includes all utilities, site preparation, site improvements, pavements, and all necessary work for a complete and usable facility.
This project is fully designed, and all technical specifications and drawings will be provided at the issuance of the Solicitation.
Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found on the System of Award Management System {SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Therefore, telephone and Fax requests for this solicitation will not be honored.
Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Contractors must register at the SAM website at https://sam.gov to download the solicitation for this project.
If/when issued, Amendments will be posted to the above-referenced website for electronic downloading. This will be the only method of distributing amendments before closing; therefore, the Offerors must check the website periodically for any amendments to the solicitation.
Registrations: System for Award Management (SAM)-Offerors shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. Suppose the Offeror is a Joint Venture (JV). In that case, the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If an Offeror is not actively and successfully registered in the SAM database at the time of award, the Government reserves the right to award to the next prospective Offeror.
Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronic via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried, etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.
Point of Contacts: Contracting Officer - Mr. Greg Graham - [email protected]
Contract Specialist - Michelle Munn - [email protected]
The U.S. Army Corps of Engineers Savannah District intends to issue an invitation for bid for project UHHZ063000 to construct a new air traffic control tower and base operations facility at Robins Air Force Base, Georgia. This acquisition is a 100% Total Small Business Set-Aside (SBA) classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1BA, Construction of Air Traffic Control Towers. The project has an estimated construction magnitude between $25,000,000 and $40,000,000. The government anticipates awarding a single firm-fixed-price, C-type stand-alone contract using sealed bid procedures.
The project scope involves all work necessary to construct a complete and usable facility, including reinforced concrete foundations, brick veneer and insulated metal panel exterior walls, and a structural steel frame for the tower. Functional areas will include personnel offices, training and briefing rooms, a simulator room, and a control cab. The facility will be equipped with a 750KW backup generator, HVAC, fire and lighting protection, and communications systems. Work also includes site preparation, utilities, pavements, and site improvements. The performance period is established at 780 calendar days following the issuance of the notice to proceed.
The solicitation is expected to be released on June 15, 2026, with a response deadline of June 12, 2026, and an approximate closing date of July 14, 2026. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Michelle Munn and Greg Graham are the primary points of contact for this pre-solicitation notice, which was published on June 2, 2026, and includes one PDF attachment. All technical specifications and drawings for this fully designed project will be provided when the solicitation is formally issued.