Name | Type | Posted | Actions |
|---|---|---|---|
EDR.pdf | Jun 8, 2026 | ||
SPRHA226Q0043_______0005.pdf | Jun 1, 2026 | ||
SPRHA226Q0043_______0004.pdf | May 4, 2026 | ||
EI_14161-402-1_v1.pdf | Apr 27, 2026 | ||
SPRHA226Q0043_______0003.pdf | Apr 27, 2026 | ||
SPRHA226Q0043_______0002.pdf | Apr 23, 2026 | ||
69E49479_07868_2D Drawing_J.pdf | Apr 23, 2026 | ||
SPRHA226Q0043_______0001.pdf | Apr 8, 2026 | ||
EDR.pdf | Mar 17, 2026 | ||
SOW.pdf | Mar 17, 2026 | ||
CDRLFATR.pdf | Mar 17, 2026 | ||
CDRLCPP.pdf | Mar 17, 2026 | ||
Unmarked Engineering Data.pdf | Mar 17, 2026 | ||
TDP.zip | ZIP | Mar 17, 2026 | |
SPRHA226Q0043.pdf | Mar 17, 2026 | ||
EDL.pdf | Mar 17, 2026 |
MMIII Cable Assembly, Spec
DLA Aviation at Ogden, UT, is procuring 19 electrical branched cable assemblies (NSN 6150-01-453-1163) for the LGM-30 Minuteman III system. This firm-fixed-price solicitation is a 100% small business set-aside. Five amendments have been issued to date, primarily to extend the response deadline and adjust the delivery schedule. The current deadline is June 9, 2026, with delivery timelines for First Article and production units set at 325 days each. Technical requirements include strict adherence to the provided engineering data list, counterfeit prevention planning, and specialized military packaging. Access to technical data is restricted to DoD personnel and qualified U.S. contractors under Distribution Statement D. The technical requirements are build-to-print, based on an Engineering Data List and detailed drawings that include critical characteristics for the Ground Readiness Program. Execution of First Article testing with a delivery timeline of 325 days after receipt of order.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
April Blakeley
Not specified
19 each of NSN 6150-01-453-1163.
This is a 100% small business set aside.