BOWLING CENTER AND F&B UPGRADES
The Department of the Navy, through the Commander Navy Installations Command, is seeking proposals for the renovation and modernization of an eight-lane bowling center and food and beverage operation at NAF El Centro, California. This design-build project covers site investigation, architectural and engineering design, and construction to deliver a complete facility. Specific requirements include replacing existing pinsetter units with string bowling technology, creating an electronic gaming area, and upgrading food service operations. The solicitation, NAVMWR-26-R-0038, has a response deadline of June 16, 2026. As a Non-Appropriated Fund (NAF) project, it follows specific Navy NAF regulations rather than the standard Federal Acquisition Regulation (FAR). The project budget is approximately $2.3 million. The contractor will manage all phases from initial site surveys and utility locates to final equipment installation. The solicitation package includes the base document and two amendments. These establish mandatory design-build phases at 50%, 95%, and 100% completion. Amendment 0002 incorporates pre-proposal conference minutes, clarifies USBC compliance, and allows for 'or equal' substitutes for specialized bowling hardware. The Department of the Navy is modernizing the eight-lane Bowling Center at NAF El Centro through a design-build contract. The project covers site investigation, design, demolition, and construction to update Building 485 with new string pinsetters, a gaming area, and improved food service facilities. The project involves a complete design-build modernization of Building 485 at NAS El Centro, focusing on an eight-lane bowling facility.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Nika Maldonado, Contracting Officer
El Centro, CA
USA
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete...
View more3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.