Name | Type | Posted | Actions |
|---|---|---|---|
FA811823R0022.pdf | Jun 21, 2023 | ||
CAV_AF_REPORTING.pdf | Jun 21, 2023 | ||
CDRL.pdf | Jun 21, 2023 | ||
DI-MGMT-80441D_GP_REPORT.pdf | Jun 21, 2023 | ||
DI-MGMT-80969_PROD_SURGE_PLAN.pdf | Jun 21, 2023 | ||
DI-MGMT-81838_CAV Reporting.pdf | Jun 21, 2023 | ||
DI-PSSS-81995A_CDM_MTH_REPORT.pdf | Jun 21, 2023 | ||
Dl-MGMT-80503_SHIP_PKG_DESCREP.pdf | Jun 21, 2023 | ||
GFP.pdf | Jun 21, 2023 | ||
PKGRQMT_REPORT.pdf | Jun 21, 2023 | ||
STATEMENT_OF_WORK.pdf | Jun 21, 2023 | ||
TRNSPDATA_REPORT.pdf | Jun 21, 2023 | ||
SPECIAL_PKG_INSTRUCTIONS.pdf | Jun 21, 2023 |
REMANUFACTURE OF KC-135 HEAT EXCHANGER
Contact and place of performance
Bridgette Miles
UNITED STATES
REMANUFACTURE OF KC-135 HEAT EXCHANGER A 3-YEAR (ONE-YEAR BASIC AND 2 ONE-YEAR OPTION PERIODS) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED. (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessar...
View more
Applicable Tech Data: If not listed on the approved vendors list in order to receive any technical data related to
this solicitation, send your T.O. request (DD Form 2345 and letter on company letterhead) to the Public Sales
Office ([email protected]). The Public Sales Office will track this entire process (Please allow 30
calendar days before requesting status of your request.). The form, including instructions for completing the form,
is available at: https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf.
In order to receive any technical data related to this acquisition, approved vendors must send an email request to
Bridgette Miles at [email protected]. The request shall include the applicable solicitation number, the
specific data needed (including TO numbers), and a copy of the current, approved DD Form 2345.
The form, including instructions for completing the form, is available
at: https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf. The Government is not
responsible for incomplete, misdirected, or untimely requests.**
To obtain Drawings, submit your request through the JEDMICS website. JEDMICS homepage:
https://jedmics.af.mil/webjedmics/index.jsp. All off base contractors who need an account will need to complete
the instructions at the following link: https://jedmics.af.mil/webjedmics/splash/training/NEWCTR2875.pdf
(d) As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a
potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
Release of data is subject to applicable data rights.
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as
“estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the
Government Property clause of the contract.
(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance
with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be
determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost
for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be
included in the unit price(s) of the listed item(s).
(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly
notify the administrative contracting officer in writing and shall not perform further overhaul on any such items
except at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO
that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO.
Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated
effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the
contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal
is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely
submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.
(h) Condemned units shall not be counted as production.
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing
necessary parts to meet the Government’s required delivery schedule.
(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated
at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are
necessary.
(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor
determined location and method of marking is acceptable.
(l) Dates listed in clauses 252.216-7006, 52.216-19 and 52.216-21 are based on the estimated award date. These
dates will be revised prior to award based on the actual award date.
(m) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond
the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed
by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit
price(s) of the listed item(s).
The United States Air Force is soliciting proposals for the remanufacture of KC-135 heat exchangers under solicitation number FA811823R0022. This requirement involves providing all necessary material, plant facilities, labor, parts, equipment, and expertise to restore end items to a like-new condition, including packing, preservation, and packaging. The resulting award is contemplated as a firm-fixed-price requirements type contract featuring a three-year performance period, consisting of a one-year basic period and two one-year option periods.
Contractors must meet specific qualification requirements, and those not previously qualified must submit a Source Approval Request package to the Small Business Office. The acquisition is classified under NAICS 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing, and PSC 1660, Aircraft Air Conditioning, Heating, and Pressurizing Equipment. Performance will take place in the United States, and all work must adhere to established unit prices and technical specifications. Interested vendors are required to submit their responses by the deadline of July 26, 2023.
The scope of work includes mandatory Item Unique Identification marking and potential Pre-Award Surveys or Initial Production Evaluations. While the government provides property for repair, contractors are responsible for managing component parts with long lead times to meet delivery schedules. If an item is determined to be beyond remanufacture limits after disassembly or inspection, the contractor must notify the administrative contracting officer for disposal instructions. The solicitation includes 13 attachments, such as the CDRL, production surge plan, and various reporting requirements.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.