Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U2926¬iceType=CombinedSynopsisSolicitation | LINK | Mar 30, 2026 |
Request for Quote (RFQ) - EDCO 30 in Self-Propelled Gasoline Concrete Saw (ED31400)
Contact and place of performance
Daniel Goldberg
21702
The purpose of this amendment is to update the Schedule of Supplies/Services to add a new Contract Line Item Number CLIN 002 for one 1 30 inch concrete saw blade. Clarify the Salient Characteristics for CLIN 001 EDCO SS30 30 Inch Gasoline Self-Propelled Concrete Saw or Equal to explicitly note that the blade is not included with the base unit and must be quoted separately under CLIN 002.Establish the minimum firm requirements and salient characteristics for both CLIN 001 and CLIN 002 to facilitate Brand Name or Equal evaluations. All other terms and conditions of the solicitation remain unchanged.
The Mission and Installation Contracting Command (MICC) at Fort Drum, acting on behalf of the Department of the Army, has issued a combined synopsis and solicitation under solicitation number W911S226U2926. This federal opportunity is designated as a small business set-aside (SBA) and is classified under NAICS code 333991, Power-Driven Handtool Manufacturing, and PSC 3895, Miscellaneous Construction Equipment. Responses to this solicitation are due by April 20, 2026.
The procurement seeks an EDCO SS30 30-inch gasoline self-propelled concrete saw or a functionally equivalent unit. Based on recent amendments, the requirement is divided into two distinct contract line items. CLIN 001 covers the self-propelled gasoline concrete saw unit, while CLIN 002 covers a single 30-inch concrete saw blade. The solicitation clarifies that the saw blade is not included with the base unit and must be quoted separately. The government has established minimum firm requirements and salient characteristics for both items to facilitate the evaluation of brand name or equal submissions.
Administrative details for this notice include one PDF attachment posted on March 30, 2026, which aligns with the initial publication date. Daniel Goldberg serves as the primary point of contact for this requirement. All other terms and conditions remain as established in the original notice and subsequent updates through April 14, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.