Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 18, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 18, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 18, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3274¬iceType=CombinedSynopsisSolicitation | LINK | May 18, 2026 |
Mower
Contact and place of performance
Karl Anderson
13602
Commercial Front Mower TerrainCut (72?) Cut Diesel Engine 30-40hp direct injected liquid cooledHydrostatic full time 4WE, dual speed transmission W/on-demand (2) pedal foot control 6-8 Gauge Iron side discharge mower deck W/Cutting height 1-6 inchesMarket foam filled turf tires W/Flat free caster deck wheelsSpeed range 0-15 mph Hi-forward 0-5 Hi-reverseAutomotive type charging system 12v Battery W/ 75-100 amp alternator Hydraulic steering Internal wet disk brakes ROPS Drive wheels 26x12-12 Steering wheels 20x10-10Ground clearance 7-10 inches Orange beacon safety light LEDFront anti-Scalp rollers, Rear anti-Scalp rollers
The Department of the Army, specifically the W6QM MICC-Fort Drum, has issued a combined synopsis and solicitation under identifier W911S226U3274 for the procurement of a commercial front mower. This requirement is designated as an SBA (Small Business Administration) set-aside. The acquisition is classified under NAICS code 333112, Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing, and PSC 3750, Gardening Implements and Tools.
The requested equipment is a TerrainCut commercial front mower featuring a 72-inch 6-8 gauge iron side discharge deck with a cutting height range of one to six inches. Technical specifications include a 30-40hp direct-injected liquid-cooled diesel engine, a dual-speed hydrostatic full-time 4WD transmission with two-pedal foot control, and a speed range of 0-15 mph in forward and 0-5 mph in reverse. The unit must also include hydraulic steering, internal wet disk brakes, foam-filled turf tires with flat-free caster deck wheels, a ROPS safety system, an orange LED beacon safety light, and front and rear anti-scalp rollers.
Responses for this solicitation are due by May 19, 2026. The primary point of contact for the requirement is Karl Anderson. Associated documentation includes one PDF attachment published on May 18, 2026. All procurement details originate from the Department of the Army’s notice published through the MICC-Fort Drum contracting office.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.