Name | Type | Posted | Actions |
|---|---|---|---|
B08_Solicitation_(Attachment_1_-_SOW).pdf | Jun 4, 2026 | ||
B08_Solicitation_(Attachment_4_-_Submittal_List).xls | XLS | Jun 4, 2026 | |
B08_Solicitation_(Attachment_2_-_DOL_Wage_Determination).pdf | Jun 4, 2026 | ||
B08_Solicitation_(Attachment_3_-_Limitations_on_Subcontracting_Report).xlsx | XLSX | Jun 4, 2026 | |
Sol_140P6026Q0053.pdf | Jun 4, 2026 |
St. Croix National Scenic Riverway - Replace Fence
The National Park Service is seeking quotations for fence replacement and material storage bin installation at the St. Croix National Scenic Riverway. This total small business set-aside, solicitation 140P6026Q0053, covers construction at the Lower District Shop and Ray's Garage. Work includes earthwork, K-Klass chain-link fencing, and concrete bin block placement, all to be completed within 90 days. Technical requirements involve specific gate operators and archaeological oversight during excavation. A 100% payment bond is required, and labor must comply with Department of Labor wage determinations. Quotes are due by July 8, 2026. The project requires replacing fencing and installing storage bins within a 90-day window. Technical standards specify K-Klass chain-link fencing and concrete bin blocks. Earthwork must follow Division 31 specifications, and all ground-disturbing activities require coordination with archaeological oversight. The National Park Service is replacing perimeter fencing and building material storage areas at the Lower District Shop in Dresser and Ray's Garage in St. Croix Falls. The work involves removing 678 linear feet of old fencing and installing new K-Klass systems, automated gates, and concrete storage bays. The performance period is 90 calendar days from the Notice to Proceed.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Kircher, Adam
ST. CROIX FALLS, WI 54024
USA
St. Croix National Scenic Riverway - Replace Fence