Installation of Washer and Dryer in Greenhouse
Contact and place of performance
Jim Roloff
Gastonia, NC 28054
USA
The AMS Science & Technology Program operates a greenhouse facility requiring the installation of a stacked washer and dryer to support laboratory and operational needs. The program already owns a Samsung front‑load washer and dryer set, which is compatible with stackable installation. A stacking kit needs to be supplied and installed as part of the project. The installation area is located along an exterior wall in the greenhouse entryway. Existing plumbing must be reconfigured, and new electrical, ventilation, and structural modifications are required.
Two sets of photos are posted below.
RFIs posted below.
Site visit attendance sheet posted below.
The USDA Animal and Plant Health Inspection Service (APHIS) requires the installation of a government-owned stacked washer and dryer at a greenhouse facility in Gastonia, North Carolina. This project supports the laboratory and operational needs of the AMS Science & Technology Program by installing an existing Samsung front-load washer and dryer set. The scope of work includes supplying and installing a compatible stacking kit, reconfiguring existing plumbing, and performing necessary electrical, ventilation, and structural modifications along an exterior wall in the greenhouse entryway.
This combined synopsis/solicitation is identified as solicitation number 12639526Q0143 and is designated as an SBA Small Business Administration (SBA) set-aside. The procurement is classified under NAICS 238220, Plumbing, Heating, and Air-Conditioning Contractors, and PSC Y1JZ, Construction of Miscellaneous Buildings. Responses are due by June 10, 2026, and Jim Roloff serves as the point of contact.
Seven attachments are associated with this notice, including a statement of work, federal construction wage rates for Gaston County, requests for information with responses, photos of the site, and a site visit attendance sheet. The notice was published on May 9, 2026, and was last updated on June 3, 2026. All work will be performed at the Gastonia, North Carolina, location.