Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment FA813726R00230002 SF 30.pdf | Jun 12, 2026 | ||
Solicitation Amendment FA813726R00230002 Page 1 - fillable.pdf | Jun 12, 2026 | ||
WWYK230053 Pre-Bid RFIs COR Signed.pdf | Jun 9, 2026 | ||
Solicitation Amendment FA813726R00230001 SF 30.pdf | Jun 9, 2026 | ||
Solicitation Amendment FA813726R00230001 Page 1 - fillable.pdf | Jun 9, 2026 | ||
WWYK230053 Site Visit Sign In Sheet.pdf | May 4, 2026 | ||
Wage Determination.pdf | Apr 23, 2026 | ||
Att9_230053_Liquidated Damages Spreadsheet.pdf | Apr 23, 2026 | ||
Att10_230053_STATEMENT OF WORK.pdf | Apr 23, 2026 | ||
Solicitation - FA813726R0023.pdf | Apr 23, 2026 | ||
Solicitation - FA813726R0023 Pgs 1-4 - fillable.pdf | Apr 23, 2026 | ||
Att10a_230053_RMDF.pdf | Apr 23, 2026 | ||
Att13_230053 Drawings.pdf | Apr 23, 2026 | ||
Att12_230053_Submittal_Register.pdf | Apr 23, 2026 | ||
230053_Ozone Depleting Statement.pdf | Apr 23, 2026 | ||
230053_Green Procurement Statement.pdf | Apr 23, 2026 | ||
Att11_230053_Design Narrative.pdf | Apr 23, 2026 |
TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
The Air Force Sustainment Center at Tinker Air Force Base is soliciting design-build services to replace a fuel vault and tank at Building 3202. This requirement is limited to current holders of the Tinker AFB Multiple Award Construction (MAC) Basic Ordering Agreement (BOA). The project includes engineering, labor, and materials to install a new above-ground diesel tank, ventilation, fuel piping, and electrical upgrades. This firm-fixed-price effort has an estimated value between $1,000,000 and $5,000,000, with a performance period of 330 calendar days from the notice to proceed. Amendment 0001 added a mandatory bid guarantee and provided responses to pre-bid requests for information. Technical execution is governed by a Statement of Work, design narratives, and eight engineering drawings requiring compliance with Unified Facilities Criteria (UFC) and National Fire Protection Association (NFPA) standards. A bid guarantee of 20% of the bid price or $3,000,000 is required with the proposal. Project WWYK230053 is a design-build effort to replace the underground fuel vault and tank at Building 3202 on Tinker Air Force Base. The contractor will provide all design, engineering, materials, labor, and quality control for a new above-ground diesel tank inside the facility. This firm-fixed-price project has a 330-day performance period and an estimated value between $1,000,000 and $5,000,000.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Megan Donaghe
OK 73145
USA
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 12 June 26 1) Amendment 2 issued to change the proposal due date from 4:00pm on 19 June 2026 to 2:00pm on 22 June 2026. Please include signed solicitation and amendments with the proposal package. THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY Updated 9 June 26 1) Amendment 1 issued. The purpose of this amendment is to reflect the following:&n...
View moreUpdated 4 May 26
1) RFIs are due Thursday, May 7 at 1600CST (4:00pm)
2) Sign in sheet has been added to attachments
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
Project Solicitation Number: FA813726R0023
Project Title: WWYK230053 - Replace Vault and Fuel Tank, B3202
Project Location: Tinker AFB, B3202
IAW FAR 36.101-3 the magnitude of this project is between $1,000,000 and $5,000,000
IAW FAR 52.232-18 Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
The work to be performed under the terms of this contract consists of furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the installation of a new above-ground diesel tank inside B3202 at Tinker Air Force Base (AFB), Oklahoma (reference the project SOW and drawings for additional information).
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or accessing the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission sent to your email. In the email, please provide email addresses for Prime Contractors points of contact ONLY, to have a DoD Safe link sent to. Do not include any sub-contractor email addresses.
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY
After review of the project specific documents, if you are a Tinker AFB - MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received by noon on 27 April 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access.
After receipt of your RSVP and EAL if required, Initial Site Visit is set for Tuesday, 28 April, 2026 at 1300 (1:00pm) CST on Tinker AFB, B3202. Meeting location will be the fuel tank on the east side of B3202.
You must attend the initial Site Vist for the project to be considered eligible to propose.
Requests for Information (RFIs) are due Thursday, 7 May, 2026 @ 1600 (4:00pm)
Please submit your RSVP to Sara Hinds at "[email protected]" and Megan Donaghe at "[email protected]."
THIS POSTING IS FOR TINKER AFB - MAC BOA HOLDERS ONLY