Name | Type | Posted | Actions |
|---|---|---|---|
Synopsis_10Jan2023.pdf | Jan 11, 2023 |
Fort Campbell Construction Multiple Award Task Order Contract (MATOC) Pre-Solicitation Synopsis
Contact and place of performance
Jessica Raulerson
KY 42223
Action Code: N/A Date: 1/11/2023 Year: 2023 Contracting Office Zip Code: 42223 Product or Service Code: Z2JZ: Repair or Alteration of Miscellaneous Buildings Contracting Office Address: MICC Fort Campbell, Bldg 6923 38th and Desert Storm Avenue, Fort Campbell, KY 42223 Proposed Solicitation Number: W91248-23-R-0001 Closing Response Date: TBD Contracting Officer: Eric C. Boston Solicitation Number: W91248-23-R-0001 Co...
View moreIn accordance with FAR Part 36.211 Distribution of Advance Notices and Solicitations, contractors are required to submit requests for equitable adjustment as a result of change orders to the issuing Contracting Officer. Contractors are required to acknowledge the change order within 30 days and are to submit their request for adjustment which includes all supporting documents as soon as possible, but not later than the required completion date of the contract. In the table below is the agency’s past performance, for the period of three fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts.
The Mission and Installation Contracting Command (MICC) – Fort Campbell has issued a pre-solicitation notice for a Multiple Award Task Order Contract (MATOC) to support the Fort Campbell Directorate of Public Works. This 100% HUBZone set-aside acquisition, identified under solicitation number W9124823R0001, requires a broad range of maintenance, repair, and minor construction services across the Fort Campbell, Kentucky, installation. The contractor will provide all supervision, personnel, equipment, and materials necessary to execute tasks such as carpentry, roofing, electrical, HVAC, plumbing, masonry, roadwork, and the construction of new structures or facilities.
The requirement is classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Z2JZ Repair or Alteration of Miscellaneous Buildings. The ordering period for this contract is five years, with performance expected to begin in or around August 2023. The total magnitude of this requirement is estimated at a $275,000,000.00 ceiling. All work must be performed in accordance with federal, state, and local regulations to maintain safe and operational conditions as defined in each individual task order.
Responses for this pre-solicitation are due by January 25, 2023. Jessica Raulerson and Eric C. Boston serve as the primary points of contact for this requirement at the MICC Fort Campbell office. One attachment, a synopsis document updated on January 11, 2023, is associated with this notice. Consistent with FAR Part 36.211, the government has provided historical data regarding the time required to definitize equitable adjustments for change orders under construction contracts within the official notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.