Name | Type | Posted | Actions |
|---|---|---|---|
HDV_QAs_SET_5_-_08_OCT_2019.xlsx | XLSX | Oct 8, 2019 | |
W56HZV19R0079-0003.pdf | Oct 7, 2019 | ||
Copy_of_HDV_QAs_SET_4_-_07_OCT_2019.xlsx | XLSX | Oct 7, 2019 | |
Copy_of_HDV_QAs_SET_3_-_19_SEP_2019.xlsx | XLSX | Sep 19, 2019 | |
W56HZV19R0079-0002.pdf | Sep 16, 2019 | ||
AMEND_Spec_-_Heavy_Duty_Water_and_Fuel_Truck.doc | DOC | Sep 16, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Water_and_Fuel_Truck.docx | DOCX | Sep 16, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.docx | DOCX | Sep 16, 2019 | |
AMEND_Spec_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.doc | DOC | Sep 16, 2019 | |
HDV_QAs_SET_2_-_11_SEP_2019_AZ.xlsx | XLSX | Sep 11, 2019 | |
HDV_Q&As_SET_1_-_26_AUG_2019.xlsx | XLSX | Aug 26, 2019 | |
Attachment_0005_-_Pricing_FINAL.xlsx | XLSX | Aug 26, 2019 | |
AMEND_Spec_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.doc | DOC | Aug 26, 2019 | |
AMEND_Spec_-_Heavy_Duty_Water_and_Fuel_Truck.doc | DOC | Aug 26, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Flatbed_&_Personnel_Carrier_Truck.docx | DOCX | Aug 26, 2019 | |
AMEND_TIQ_-_Heavy_Duty_Water_and_Fuel_Truck.docx | DOCX | Aug 26, 2019 | |
W56HZV19R0079-0001.pdf | Aug 26, 2019 | ||
Attachment_0002_Specification_Flatbed_&_Personel_Carrier_HDV_Variants.pdf | Aug 8, 2019 | ||
CDRL_A005_First_Production_Vehicle_Final_Report.pdf | Aug 8, 2019 | ||
Attachment_0003_TIQ_Water_and_Fuel_HDV_Variants_(07_AUG_2019).docx | DOCX | Aug 8, 2019 | |
Attachment_0001_Specification_Water_&_Fuel_HDV_Variants.pdf | Aug 8, 2019 | ||
Attachment_0005_-_Pricing_&_Spares.xlsx | XLSX | Aug 8, 2019 | |
Attachment_0004_TIQ_Flatbed_&_Personel_Carrier_HDV_Variants_(07_AUG_2019).docx | DOCX | Aug 8, 2019 | |
Attachment_0006_Critical_Components_List_Water_&_Fuel_Variants.xlsx | XLSX | Aug 8, 2019 | |
CDRL_A004_Final_Inspection_Report.pdf | Aug 8, 2019 | ||
W56HZV19R0079.pdf | Aug 8, 2019 | ||
CDRL_A001_Photographs.pdf | Aug 8, 2019 | ||
Attachment_0008_Offeror_Compliance_Checklist.xlsx | XLSX | Aug 8, 2019 | |
CDRL_A002_Start_of_Work_Meeting_.pdf | Aug 8, 2019 | ||
Attachment_0007_Critical_Components_List_Flatbed_&_Personel_Carrier_Truck_Variants.xlsx | XLSX | Aug 8, 2019 | |
CDRL_A003_Start_of_Production.pdf | Aug 8, 2019 |
Heavy Duty Variants (HDV)
Contact and place of performance
Andrew J. Zielinsky
Not specified
The amendment page will have to be acknowledged and signed and returned via mail per Section L.2.2.3 Proposal Submission Address - Proposals shall be submitted to the address below. All proposals delivered in response to this solicitation, whether hand-carried or submitted via U.S. mail, shall be addressed as follows: US Army Contracting Command Warren Bid Room, Bldg 231, Mail Stop 303 Attn: W56HZV-19-R-0089 Non-standard Heavy Duty Vehicles (Multiple Variants) Proposal 6501 East 11 Mile Road Warren, MI 48397 5000 No exceptions will be considered.
The U.S. Army Corps of Engineers issued this combined synopsis and solicitation, identified by solicitation number W56HZV19R0079, for the procurement of multiple variants of non-standard Heavy Duty Vehicles. This requirement falls under NAICS code 336120 for Heavy Duty Truck Manufacturing and PSC code 23. The scope of the acquisition includes specific configurations such as heavy-duty water and fuel trucks as detailed in the thirty-one associated attachments, which include multiple sets of questions and answers and formal amendments to the specifications.
Proposals must be submitted by the response deadline of October 15, 2019. Submissions, including signed and acknowledged amendment pages, are required to be delivered via mail or hand-carried to the US Army Contracting Command Bid Room in Warren, Michigan. Andrew J. Zielinsky serves as the point of contact for this solicitation, which was originally published on June 4, 2019, and underwent its final update on October 9, 2019.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.