Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 10, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 10, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 10, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=PANNWD26P027594¬iceType=SourcesSought | LINK | Mar 10, 2026 |
POL,CMP-RPR,FY26,PNG,TANK10515-10516
Contact and place of performance
Kristal Dobry
Not specified
Perform tank repairs on a field fabricated aboveground storage tanks FAC 10515 FAC 105161 at Pease ANGB Portsmouth, NH based on approved Inspection report option(s) to include: Scope of Work, Drawings, and Cost Estimate. Conduct Stakeholder and internal reviews, as needed, to generate Advertisement package. Tank will be brought into conformance with API 653, NFPA 30, applicable UFGS and in compliance with 40 CFR 112, UFC 3-460-03, AW 78-24-27 and any other applicable federal, state or local requirements Respond to all Bidder Inquiry questions during the proposal phase, and provide a Conformed Set (contract award package).
The U.S. Army Corps of Engineers, Omaha District, issued this sources sought notice for the repair of field-fabricated aboveground storage tanks FAC 10515 and FAC 10516 at Pease Air National Guard Base in Portsmouth, New Hampshire. The project involves performing repairs based on approved inspection report options, including the development of a scope of work, drawings, and cost estimates. The contractor must conduct stakeholder and internal reviews to generate an advertisement package and ensure the tanks are brought into conformance with API 653, NFPA 30, and various federal, state, and local requirements, such as 40 CFR 112 and UFC 3-460-03.
This requirement is identified by solicitation number PANNWD26P027594 and falls under NAICS code 541990, All Other Professional, Scientific, and Technical Services, and PSC Y1GC, Construction of Fuel Storage Buildings. Responsibilities include responding to bidder inquiries during the proposal phase and providing a conformed contract award package. Responses for this market research effort are due by March 27, 2026, and one PDF attachment was included with the notice published on March 10, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.