Name | Type | Posted | Actions |
|---|---|---|---|
Appendix_A_SOW.docx | DOCX | Jun 1, 2026 | |
SOW ADC.docx | DOCX | Jun 1, 2026 | |
Section L.pdf | Jun 1, 2026 | ||
REPSHIP.doc | DOC | Jun 1, 2026 | |
Item_Description.pdf | Jun 1, 2026 | ||
ES7034.pdf | Jun 1, 2026 | ||
Statement of Objectives.pdf | Jun 1, 2026 | ||
Section M.pdf | Jun 1, 2026 | ||
CADPAD Item Marking Instruction - Ver 1.6.pdf | Jun 1, 2026 | ||
CDRLs.pdf | Jun 1, 2026 | ||
SPI.pdf | Jun 1, 2026 | ||
Solicitation.pdf | Jun 1, 2026 |
Arm Fire Initiator Remanufacture
The Air Force Life Cycle Management Center (AFLCMC) requires the remanufacture of C-17 Arm Fire Initiators under a firm-fixed-price contract. This work involves disassembling, cleaning, inspecting, maintaining, reassembling, and testing explosive-actuated components. These items are classified as Critical Safety Items (CSI), requiring adherence to safety and quality protocols in Nibley, Utah. Technical requirements are detailed in the Statement of Work and Statement of Objectives, with specific instructions for ammunition data cards and marking. Proposals are due July 1, 2026, and will be evaluated on technical merit and price, with merit carrying more weight. The contract includes 11 Data Requirements Lists (CDRLs) and hazardous material packaging instructions. Compliance with ISO 9001:2015 and a DPAS rating of DO-A6 is required. Energetic materials must be less than 24 months old and reported through the Worldwide Ammunition-data Repository Program (WARP). The Air Force Life Cycle Management Center (AFLCMC) is seeking the remanufacture of C-17 Arm Fire Initiators. This involves maintenance and overhaul for six National Stock Numbers (NSNs) used in aircraft egress systems. The process includes disassembly, cleaning, inspection, maintenance, reassembly, and testing to ensure reliability for safety-critical applications. The Air Force requires remanufacturing of C-17 Arm Fire Initiators to restore explosive-actuated components to a serviceable state. Work includes disassembly, cleaning, inspection, maintenance, reassembly, and testing. The contractor must return Government Furnished Property (GFP) to a state meeting original performance requirements using Technical Orders or OEM procedures.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Darin Barnes
NIBLEY, UT
USA
Arm Fire Initiators Remanufacture contract. Qualified sources please provide a proposal. Please provide a list of any subcontractors that will be working on this contract as well.