Name | Type | Posted | Actions |
|---|---|---|---|
Drawings 20260319-TP-Bldg 110-BasePlan-RPM.pdf | Jun 10, 2026 | ||
Images of flooring project at buildings 102 and 110.docx | DOCX | Jun 10, 2026 | |
Questions and Answers HAYW 26-2010 Bldg. 102 110 Flooring.docx | DOCX | Jun 10, 2026 | |
Drawings 20260317-TP-Bldg 102-BasePlan-RPM (1).pdf | Jun 10, 2026 | ||
Base Access Request - 144 SFS DVES FORM (20240320).pdf | May 21, 2026 | ||
Base Access Request - 144 SFS DVES FORM (20240417).pdf | May 19, 2026 | ||
Wage Determination ca18.pdf | May 19, 2026 | ||
Solicitation - W50S6T26QA021 Professional Appearance.pdf | May 19, 2026 | ||
Attachment 3 SOW HAYW262010 - Replace B102 and B110 Floor.pdf | May 19, 2026 |
Replace Flooring Bldg 102 & Bldg 110
Contact and place of performance
Justin Scales
Fresno, CA 93727
USA
The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work. The magnitude of this requirement...
View more(A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.
(B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:
Selected Agency: DEPT OF THE ARMY
Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts
30 days or less: 0
31 to 60 days: 1
61 to 90 days: 0
91 to 180 days: 0
181 to 365 days: 1
Greater than 365 days: 1
After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2
Update 1: Questions and Answers, Images of Flooring and Drawings are attached.
The Department of the Army, W7MX USPFO Activity CAANG 144, has issued solicitation W50S6T26QA021 for the repair and alteration of flooring at Buildings 102 and 110 in Fresno, California. This requirement is categorized under NAICS code 238110 Poured Concrete Foundation and Structure Contractors and PSC Z2JZ REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS. The opportunity is designated as an SBA (SBA) set-aside with an estimated project magnitude between $25,000 and $100,000.
The contractor must provide all supervision, labor, materials, tools, and equipment necessary to remove approximately 1,260 square feet of vinyl and carpet flooring and recondition approximately 4,825 square feet of existing floors across the two separate buildings. Responses are due by June 12, 2026. The acquisition process included a site visit on May 27, 2026, which required attendees to complete Defense Biometric Identification System (DBIDS) prequalification and submit base access forms prior to the event.
Justin Scales is the designated point of contact for this solicitation. The notice includes nine total attachments, including floor plans for both buildings, project images, base access request forms, and a questions and answers document. The National Guard Bureau has also provided historical data regarding the time required for the Department of the Army to definitize equitable adjustments for change orders under construction contracts as part of this notice.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.