Name | Type | Posted | Actions |
|---|---|---|---|
12467020R0033 Amendment 3 - SF-30.pdf | Apr 17, 2020 | ||
12467020R0033 Body - Amendment 3.doc | DOC | Apr 17, 2020 | |
12467020R0033 Amendment 2 - SF-30.pdf | Mar 30, 2020 | ||
SF 30 Amendment 1 to Solicitation 12467020R0033.pdf | Mar 5, 2020 | ||
12467020R0033 SF1442 - Amendment 1.pdf | Mar 5, 2020 | ||
Sign In Sheet.pdf | Mar 5, 2020 | ||
Site Visit Briefing 12467020R0033.pdf | Mar 5, 2020 | ||
12467020R0033 Body - Amendment 1.doc | DOC | Mar 5, 2020 | |
ATTACHMENT 3 - FY20 Road 5-31.2 Drawings (1).pdf | Mar 2, 2020 | ||
ATTACHMENT 7 - Relevant Experience Questionaire.doc | DOC | Mar 2, 2020 | |
ATTACHMENT 6 - Special SR Requirements.docx | DOCX | Mar 2, 2020 | |
ATTACHMENT 4 - FY20 Road 5-31.2 Stakeout Points (1).xlsx | XLSX | Mar 2, 2020 | |
ATTACHMENT 1 - FY20 Road 5-31.2 Schedule of Items (1).xlsx | XLSX | Mar 2, 2020 | |
12467020R0033 Body.doc | DOC | Mar 2, 2020 | |
ATTACHMENT 5 - DOL Wage Determination.pdf | Mar 2, 2020 | ||
ATTACHMENT 2 - Statement Of Work_P-Area (1).docx | DOCX | Mar 2, 2020 | |
12467020R0033 SF1442.pdf | Mar 2, 2020 |
Road Construction IDIQ - Amendment 3
Contact and place of performance
Kelly B Updegraff
New Ellenton, SC 29809
USA
The US Forest Service has a requirement for Road Construction Indefinite Delivery/Indefinite Quantity (IDIQ) on the Savannah River Site located 10 miles east of Aiken, South Carolina. The Savannah River Site is a restricted government site under the control of the Department Of Energy.This requirement is a 100% Total Small Business Set Aside. The requirement will befora one (1) year base periodwith four (4) one year...
View moreThe U.S. Forest Service is soliciting for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to support road construction efforts at the Savannah River Site in New Ellenton, South Carolina. This restricted government site, managed by the Department of Energy, requires various construction and maintenance services, including the creation of new roads, repair of existing roads, ditch construction, bridge removal and construction, and soil and berm restoration. The agency intends to award two firm-fixed-price contracts with a performance period consisting of a one-year base and four one-year options. Each awardee is guaranteed a minimum of $25,000.00 over the life of the contract, with a maximum potential award value of $5,000,000.00 per awardee.
This requirement is designated as a 100% Total Small Business Set-Aside under NAICS 237310 for Highway, Street, and Bridge Construction and PSC Y1LB for Construction of Highways, Roads, Streets, Bridges, and Railways. The solicitation, identified as 12467020R0033, has been modified through multiple amendments. Amendment 1 rescheduled the deadline and incorporated site visit notes and sign-in sheets; Amendment 2 extended the deadline; and Amendment 3 transitioned the submission process to email-only, removing options for hand delivery or mail. Proposals must be submitted to Kelly B. Updegraff by the response deadline of April 27, 2020.
The procurement record includes 17 attachments consisting of SF-30 forms for Amendments 1, 2, and 3, an amended SF-1442, a project body document, and a site visit sign-in sheet. Due to the secured nature of the Savannah River Site, access for the pre-proposal site visit held on March 3, 2020, required specific identification and advance registration with the Department of Energy. All project communications and final proposals are directed to the Francis Marion & Sumter National Forests office.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.