Name | Type | Posted | Actions |
|---|---|---|---|
Site Visit Roster.pdf | Jun 1, 2023 | ||
Amendment 001 W9128F23R0023 BSNP Missouri RIver MATOC.pdf | May 19, 2023 | ||
Attachment 4 Specifications W9128F23R0023 BSNP Base MATOC.pdf | May 15, 2023 | ||
Attachment 1 Specifications Task Order 01 (W9128F23R0023) Chute Repairs North.pdf | May 15, 2023 | ||
Solicitation W9128F23R0023 BSNP Missouri River MATOC.pdf | May 15, 2023 | ||
Attachment 2 Drawings Task Order 01 (W9128F23R0023) Chute Repairs North.pdf | May 15, 2023 | ||
Attachment 3 Past Performance Questionnaire (PPQ).pdf | May 15, 2023 |
Bank Stabilization and Navigation Project (BSNP) to repair and maintain navigation channels on Missouri River
Contact and place of performance
—
Not specified
No narrative description provided for this notice.
The Bank Stabilization and Navigation Project (BSNP) focuses on the repair and maintenance of navigation channels along the Missouri River under solicitation number W9128F23R0023. This requirement is established as a Multiple Award Task Order Contract (MATOC) designed to address riverbank stability and navigational infrastructure. Specific project components include chute repairs at northern locations, as detailed in the initial task order documentation.
The procurement process was initiated with the release of solicitation materials on May 15, 2023, and the notice was last updated on June 7, 2023. Documentation supporting this opportunity includes seven attachments, such as a site visit roster, technical specifications for the base MATOC and the first task order, and engineering drawings. These files, along with Amendment 001, provide the necessary technical framework for the required stabilization and maintenance activities.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.