No attachments available.
FUEL CONTROL, MAIN
Contact and place of performance
Nelminia R. Serrano
HUNTSVILLE, AL 35898
USA
ALL FORMAL COMMUNICATION RELATED TO THIS ACQUISITION MUST BE DIRECTED TO Nelminia R. Serrano, Contract Specialist, CCAM-ALA, via email: [email protected]. No telephone requests will be accepted. This contract action is for a five year Indefinite Delivery Indefinite Quantity (IDIQ) contract for Maintenance and Overhaul of the following item: The applicable North American Industry Classification System (N...
View moreThe Department of the Army, through W6QK ACC-RSA, is issuing a pre-solicitation notice for a five-year firm fixed-price Indefinite Delivery Indefinite Quantity contract for the maintenance and overhaul of the Fuel Control, Main. This requirement, identified under solicitation number W58RGZ19R0058, involves NSN 2915-01-371-9305 and part numbers 2-17-580-0 and 110700-02C6. The estimated quantity ranges from a minimum of 140 units to a maximum of 1,000 units, including up to 140 units for Foreign Military Sales and 860 units for the United States. Performance will take place in Huntsville, Alabama, under NAICS code 336412 Aircraft Engine and Engine Parts Manufacturing and PSC code 29.
The Fuel Control, Main is designated as a Critical Safety Item, and the contractor must furnish all depot-level labor, facilities, tools, test equipment, and materials for the overhaul process. This action is restricted to Honeywell International Inc. and Triumph Engine Control System, though all responsible sources may submit a proposal. To be eligible for award, interested sources must meet pre-qualification requirements by submitting a Source Approval Request package to the Engineering Directorate Quality Engineering Division. A Product Verification Audit is also required. While the requirement follows commercial item standards, FAR Part 12 will not be used for this acquisition.
The response deadline for this notice is May 28, 2019. All proposals must be submitted through mail or courier to the contracting point of contact, Nelminia R. Serrano, at Redstone Arsenal; electronic submissions via fax or email are not accepted. Foreign firms must process solicitation requests through their respective embassies. This requirement is currently unfunded, and the release of the final solicitation may adjust the closing date. All formal communications must be directed to the designated contract specialist via email.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.