Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 8 - (CUI) Drawings.pdf | Jun 10, 2026 | ||
Solicitation Amendment FA302226R00140002 SF 30.pdf | Jun 10, 2026 | ||
RFI B155 Roofing Questions_Answers.docx | DOCX | Jun 10, 2026 | |
Solicitation Amendment - FA302226R00140001 CO Signed.pdf | May 20, 2026 | ||
Attachment 7 - Safeguarding Controlled Unclassified Information (CUI) Acknowledgement.pdf | May 19, 2026 | ||
Attachment 1 - SOW - 21July25.pdf | May 18, 2026 | ||
Solicitation - FA302226R0014.pdf | May 18, 2026 | ||
Attachment 8 - EAL.pdf | May 18, 2026 | ||
Attachment 7 - MFR Contractor CUI Training Acknowledgment for Solicitations.pdf | May 18, 2026 | ||
Attachment 6 - Contractors CUI Training Slides.pptx | PPTX | May 18, 2026 | |
Attachment 4 - Wage Determination.pdf | May 18, 2026 | ||
Attachment 3 - Form 66.xlsx | XLSX | May 18, 2026 | |
Attachment 2 - SOW Attachments.pdf | May 18, 2026 |
Repair LRS Hazmat Roof, B155
Contact and place of performance
Oscar Gonzalez
Columbus, MS 39710
USA
Update to Amendment 2: Added amended solicitation to attachment section. Amendment 2: The purpose of this amendment is to: Add drawings to the solicitation, extend the Request for Information (RFI) due date to 17 June 2026 from 08 June 2026, and extend the Request for Proposal (RFP) due date to 26 June 2026 from 19 June 2026. ___________________________________________________________________...
View moreNOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.
Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to perform the entire design and replacement of the roof of building 155, replace the overhang covering the exhaust louver on the rear of the facility, and the overhang covering the entrance and roll up door on the front of the facility. The new roof and overhands shall eliminate every weather borne water leak into B155. The new roof shall be free from ponding. The new roof shall be insulated meeting ASHRAE zoning requirements for the facility. The new roof shall be a TPO single ply membrane roofing system. The work shall include but is not limited to: replacement of built up roof components down to roof decking, insulation, gutter system including downspouts, roof curbing, and roof coping. Perform all work according to this Statement of Work (SOW) and all related AF requirements and other codes and references.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 04 June 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 1:00 PM CST on 26 May 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 1:00 PM CST on 26 May 2026, you will not be able to attend the site visit.
Identification: All attendees must bring a valid real ID.
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB's Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors' center at 9:00 AM CST
Additional Info: All RFls must be submitted NLT 12:00 PM CST, on 08 June 2026.
The range of magnitude for this procurement is between $300,000 and $500,000.
52.232-18 Availability of Funds. Availability of Funds (Apr 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
The Department of the Air Force, specifically the 14th Contracting Squadron at Columbus Air Force Base, has issued solicitation FA302226R0014 for the repair of the LRS Hazmat roof at Building 155 in Columbus, Mississippi. This requirement is a total small business set-aside designated under NAICS 238160 for Roofing Contractors and PSC Z2AA for the repair or alteration of office buildings. The contractor must provide all plant, labor, equipment, transportation, and tools necessary for the complete design and replacement of the building's roof, including the overhangs covering the exhaust louver and the front entrance and roll-up doors. The project entails installing a TPO single-ply membrane roofing system, new insulation meeting ASHRAE zoning requirements, and a gutter system with downspouts to eliminate all weather-borne water leaks and ponding.
The solicitation response deadline is June 26, 2026. The estimated magnitude of the project is between $300,000 and $500,000, though the government’s obligation is contingent upon the availability of appropriated funds. To access restricted project drawings and Controlled Unclassified Information (CUI), offerors must complete CUI training and submit a signed acknowledgment form to the point of contact, Oscar Gonzalez. Proposals must be submitted electronically.
A site visit is scheduled for June 4, 2026, at Columbus AFB, with a mandatory registration deadline of May 26, 2026. The government has provided 13 attachments to assist with proposal development, including the Statement of Work, CUI acknowledgement forms, and multiple amendments that have updated the Request for Information (RFI) deadline to June 17, 2026, and the proposal due date to June 26, 2026. Current RFI questions and answers have also been posted as part of the formal solicitation documentation.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.